Article 40 - DESIGN OF EARTH DAMS

  1. § 5-40-1 - Definitions
  2. § 5-40-2 - Dams; plans and specifications
  3. § 5-40-2a - Benchmarks
  4. § 5-40-2b - Design reports
  5. § 5-40-3 - Specifications
  6. § 5-40-4 - Preparer of maps, plans, profiles, reports, and specifications
  7. § 5-40-5 - Determining capacity of a reservoir
  8. § 5-40-5a - Determining the height of a dam or barrier
  9. § 5-40-6 - Waiver and stricter requirements
  10. § 5-40-7 - Other maps, plans, profiles, data and specifications
  11. § 5-40-8 - Acceptable application
  12. § 5-40-9 - Revoked
  13. § 5-40-10 - Revoked
  14. § 5-40-11 - Revoked
  15. § 5-40-12 - As-built drawings
  16. § 5-40-13 - Revoked
  17. § 5-40-14 - Testing a principal spillway pipe installation in a dam; applicability
  18. § 5-40-15 - Testing a principal spillway pipe installation in a dam; general procedures
  19. § 5-40-16 - Testing a principal spillway pipe installation in a dam; allowable leakage rate, test methods
  20. § 5-40-20 - Hazard classes of dams
  21. § 5-40-21 - Class sizes of dams
  22. § 5-40-22 - Design requirements for construction of a dam
  23. § 5-40-23 - Detention storage
  24. § 5-40-24 - Dam breach analysis
  25. § 5-40-26 - Request to issue or reconsider hazard class determination
  26. § 5-40-30 - Time of concentration
  27. § 5-40-31 - Design duration rainfall depth
  28. § 5-40-32 - Determination of rainfall excess
  29. § 5-40-33 - Hydrographs
  30. § 5-40-40 - Geotechnical investigation of all dams
  31. § 5-40-41 - Geotechnical investigation of a low-impact dam
  32. § 5-40-42 - Geotechnical investigation of a high-impact dam
  33. § 5-40-43 - Cutoff trench
  34. § 5-40-44 - Embankment
  35. § 5-40-45 - Allowance for settlement of an earthen dam
  36. § 5-40-46 - Side slopes of an earthen dam
  37. § 5-40-50 - Pipes
  38. § 5-40-51 - Acceptable trash racks for primary spillways
  39. § 5-40-52 - Stilling basins
  40. § 5-40-53 - Drawdown pipes
  41. § 5-40-54 - Control of seepage along a conduit
  42. § 5-40-55 - Earthen auxiliary spillways
  43. § 5-40-56 - Maximum design velocity for an auxiliary spillway
  44. § 5-40-57 - Service spillway design
  45. § 5-40-70 - Construction notification to the chief engineer
  46. § 5-40-71 - Inspection during dam construction, repair, and modification
  47. § 5-40-72 - Construction inspection reports
  48. § 5-40-73 - Emergency action plan
  49. § 5-40-73a - Discovery of an existing illegal, unpermitted dam
  50. § 5-40-74 - Design criteria for an existing illegal, unpermitted dam
  51. § 5-40-75 - Maintenance of dams
  52. § 5-40-76 - Repair or modification of a permitted or prejurisdictional dam
  53. § 5-40-77 - Easements for dams
  54. § 5-40-90 - Requirements for a dam safety inspection report
  55. § 5-40-91 - Schedule for inspection of hazard class C dams
  56. § 5-40-92 - Schedule for inspection of hazard class B dams
  57. § 5-40-93 - Schedule for inspection of dams
  58. § 5-40-94 - Revision of schedule of inspections
  59. § 5-40-100 - Request to be included on the list of independent engineers qualified to review applications
  60. § 5-40-101 - Information to be submitted with a request to be a reviewer
  61. § 5-40-102 - Minimum requirements to be an individual reviewer
  62. § 5-40-103 - Conflict of interest
  63. § 5-40-104 - Notification of approval or disapproval to be a reviewer
  64. § 5-40-105 - Procedure for independent review of an application to construct a dam or other water obstruction
  65. § 5-40-106 - Report of findings of independent reviewer