La. Admin. Code tit. 56, § V-513 - Plugging and Sealing
A. The well or
hold shall be filled or plugged upward from the bottom of the hole or well with
neat cement or fill material, preferably in one continuous operation. Fill
and/or plugging material shall not be poured into the hole or well. The
commission may require under certain conditions, that the casing be perforated
and cement forced under pressure into the surrounding formation to prevent
movement of water in the annular space from one aquifer to another. Where the
top of the casing is cut off below ground surface the excavation above the top
of the casing shall be filled, after the surface plug is set, with enough soil
or clay to compensate for compaction. All plugs shall be placed by the
circulation or pump down method.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.