06-096 C.M.R. ch. 522, § 5 - Draft permits [see 40 CFR 124.6]
(a) Once
an application is complete, the Department shall tentatively decide whether to
prepare a draft permit or to deny the application.
(b) [reserved]
(c) If the Department tentatively decides to
issue an NPDES general permit, it shall prepare a draft general permit under
paragraph (d) of this section.
(d)
If the Department decides to prepare a draft permit, it shall prepare a draft
permit that contains the following information:
(1) All conditions under Chapter 523 (NPDES)
or Secs. 144.51 and 144.52 (UIC);
(2) All compliance schedules under Chapter
523 (NPDES) or
40 CFR
144.53(UIC);
(3) All monitoring requirements under Chapter
523 (NPDES) or
40
CFR 144.54(UIC);
and
(4) For:
(i) [reserved];
(ii) UIC permits, permit conditions under
40 CFR
144.52;
(iii) [reserved];
(iv) [reserved];
(v) NPDES permits, effluent limitations,
standards, prohibitions, conditions under Chapter 523.
(e) Draft permits shall be
accompanied by a fact sheet if required under Section 6.