Md. Code Regs. 20.56.02.03 - Required Tests
A. General. Any
meter test required by this regulation shall be made at both check flow and
full rated flow.
B. Preinstallation
Test.
(1) Meter Accuracy.
(a) Except as provided in §B(3) of this
regulation, the owner shall test a meter for accuracy before the meter is
placed in service.
(b) The date of
the accuracy test shall be within 2 years of the date the meter is placed in
service.
(2) Leak Test.
An owner shall test a meter for leaks before the meter is placed in
service.
(3) Sample Testing New
Meters. An owner may sample test new meters for accuracy in accordance with a
sample plan approved by the Commission.
C. Request Test.
(1) Request for Test. Upon request by a
customer and at no charge, the owner shall test the accuracy of the meter and
associated metering device, if installed, serving the customer. A test under
this subsection need not be made more often than once in 18 months.
(2) Customer May Observe. The customer, or
the customer's representative, may be present when the test is
performed.
(3) Report to Customer.
A report of the results of the test shall be made to the customer within a
reasonable time after the completion of the test, and a record of the report,
together with a complete record of the test, shall be kept on file at the
office of the owner for at least 3 years.
D. Referee Test.
(1) Application for Test. Upon written
application to the Commission by a customer or an owner, an accuracy test shall
be made of the customer's meter and associated metering device, if installed,
as soon as practicable by a representative of the Commission. A test under this
subsection need not be made more often than once in 18 months.
(2) Deposit for Test. The application under
§D(1) of this regulation shall be accompanied by a $10 deposit.
(3) Notice to Owner. On receipt of a request
from a customer, the Commission shall notify the owner and the owner may not
knowingly remove or adjust the meter and associated metering device, if
installed, unless instructed by the Commission. The owner shall furnish to the
Commission's representative reasonable assistance if required to make the
test.
(4) Customer May Observe. The
customer, or the customer's representative, may be present when the test is
performed.
(5) Report to Customer.
A written report of the results of the test shall be sent to the customer and
to the owner.
(6) Disposition of
Deposit. If the accuracy test shows an over-registration of more than 2 percent
at check flow, a deposit shall be refunded by the Commission and the owner
billed the amount of the deposit. If the accuracy test shows an
under-registration or an over-registration of 2 percent or less at check flow,
the Commission shall retain the deposit.
E. In-Service Performance Test.
(1) An owner shall prepare and submit to the
Commission an in-service performance plan.
(2) The Commission shall approve an owner's
in-service performance plan before its implementation.
(3) An owner shall perform an in-service
accuracy test of meters and associated metering devices, if installed, on a
periodic interval or variable interval basis.
(4) Report.
(a) An owner shall prepare a report showing
all in-service performance tests conducted during a calendar year.
(b) The owner shall submit the report to the
commission by April 1 of the following year.
F. As Found Test. An owner shall test a meter
before adjustment, repair, or retirement.
G. As Left Test. If a meter does not meet the
accuracy requirements of Regulation .04A of this chapter, an owner shall
adjust, repair, or both, and test the meter for accuracy before returning it to
service.