Md. Code Regs. 20.61.06.03 - Evaluation Criteria
A. An
application must demonstrate the proposed offshore wind project meets the
following minimum threshold criteria, as specified:
(1) The proposed offshore wind project
complies with Public Utilities Article, §
7-701(k)(1) and
(2), Annotated Code of Maryland;
(2) The term of the proposed OREC price
schedule is not longer than 20 years, and commences no earlier than January 1,
2017 for Round 1 projects and no earlier than July 1, 2017 for Round 2
projects;
(3) The OREC price on the
proposed OREC price schedule do not exceed $190 per megawatt hour in levelized
2012 dollars for Round 1 projects, as measured using a nominal discount rate
equal to the long-term composite Treasury Bond rate (or equivalent) and a
deflation rate equal to the near-term average GDP Deflator (or equivalent),
notified by the Commission to potential OSW applicants;
(4) Demonstration that the proposed project,
including the associated transmission-related interconnection facilities, will
be constructed using commercially proven components and equipment available to
the OSW applicant;
(5)
Demonstration that the project COD is reasonable in light of the permitting,
technical, construction, operational, and economic challenges generally faced
by offshore wind project developers; and
(6) Evidence of site control or demonstration
of a feasible plan to obtain site control.
B. For each application that meets the
minimum threshold criteria, the Commission shall conduct independent
qualitative and quantitative analyses that considers the criteria enumerated in
Public Utilities Article, §
7-704.1(d)(1)(i)
through (xiii), Annotated Code of Maryland.
(1) The qualitative analysis shall use a
ranking system to identify applications with characteristics that contribute to
the likelihood of successful development and to the net economic,
environmental, and health benefits to the State.
(a) The following factors shall be considered
as part of the qualitative analysis:
(i)
Qualifications of the OSW applicant's project team, including but not limited
to experience in project development, environmental permitting, engineering and
construction, operations, maintenance and financing;
(ii) Project characteristics, including but
not limited to project design (for example, demonstration that turbine layout
is consistent with best practices for optimal output and maintainability),
turbine technology (for example, commercial availability, certification status,
compatibility with project service life, warranties), foundation and support
structure (for example, suitability for site conditions, design standards),
converter station and interconnection (for example, appropriateness of
equipment for site, turbine ratings, and number of turbines; reasonableness of
interconnection and delivery points; interconnection designs consistent with
best practices), and reasonableness of claimed net capacity and annual energy
output;
(iii) Financial plan,
including but not limited to completeness and reasonableness of the plan,
financial strength of the developer, sources of debt and equity and firmness of
commitments, plan for addressing cost overruns and other development risks,
evidence of best efforts to identify and access State or federal grants,
rebates, tax credits, loan guarantees or other similar benefits available to
the proposed project and future commitments to seek out future
benefits;
(iv) Demonstration of
site control such as a BOEM lease or, alternatively, adequacy of plan for
obtaining site control, as well as arrangements for interconnection
right-of-way;
(v) Project COD and
schedule, including but not limited to reasonableness of the proposed schedule
(acknowledging, for example, weather delays), construction plan (reasonableness
of plan and level of detail, for example, port, storage, lay-down and
staging-areas, as well as evidence of consistency with procurement plan, supply
chain descriptions, and contracting strategy), and testing and commissioning
plan;
(vi) If applicable, the
reasonableness of the proposed transmission upgrade cost allocation
methodology, taking into account whether the proposed methodology fairly serves
the interest of ratepayers;
(vii)
Operations and maintenance plan, including but not limited to reasonableness of
proposed management plan and mitigation strategies and evidence of unique
requirements in the context of a large offshore wind facility (for example,
port, maintenance vessel, staffing, spare parts supplies);
(viii) Decommissioning plan, including but
not limited to quality and completeness of plan, and assurance of available
funding to decommission the plant, interconnection facilities and associated
equipment;
(ix) Transmission
improvements, including but not limited to quality and completeness of
analysis, and consideration of benefits created by associated transmission and
distribution upgrades such as improved reliability or reduced
congestion;
(x) OSW applicant's
input-output analysis required by Public Utilities Article, §
7-704.1(c)(3)(i),
Annotated Code of Maryland, including completeness of descriptions and
documentation, verifiability of model inputs and reasonableness of outputs, and
extent to which the analysis demonstrates positive net economic benefits to the
State;
(xi) OSW applicant's
analysis of the net environmental and health impacts, including impacts on the
affected marine environment based on publicly available information, to the
State including impacts during construction, operation and decommissioning of
the proposed project, including completeness of descriptions and documentation,
verifiability of model inputs and reasonableness of outputs, and extent to
which the analysis demonstrates positive net environmental and health benefits
to the State;
(xii) Extent to which
OSW applicant's proposed project will assist in meeting the renewable energy
portfolio standard, considering the expected generation confidence level
associated with the proposed OREC amount;
(xiii) Unique attributes that distinguish a
proposed project from another;
(xiv) Adequacy of the OSW applicant's plan
demonstrating engagement of small, women-owned, local, veteran-owned, and
minority businesses, commitment to the use of skilled labor, and labor
compensation plan;
(xv) Evidence of
serious, good-faith efforts to solicit participation of minority investors,
should the proposed project have sought capital investment, and evidence of
serious, good-faith commitment to solicit minority investors in future attempts
to raise capital;
(xvi) OSW
applicant's analysis of impacts on residential, commercial, and industrial
retail electric customers, including consideration of whether the analysis
properly reflects proposed OREC pricing and unique character of the applicant's
pricing proposal; and
(xvii) OSW
applicant's analysis of long-term changes to the wholesale electric market
associated with the project, including consideration of the quality of analysis
showing contributions to regional system reliability, fuel diversity,
competition, transmission congestion, and other benefits.
(b) The qualitative analysis may result in
the elimination from further consideration of an application that the
Commission determines represents a significant risk of not achieving successful
commercial operation or is not likely to provide net economic, environmental,
and health benefits to the State.
(2) The quantitative analysis shall measure
the impact of a proposed project and, as applicable, a combination of proposed
projects, expressed in monetary terms.
(a)
The quantitative analysis of the projected net rate impacts for an average
Maryland retail electric customer based on an annual consumption of 12,000
kilowatt hours and nonresidential retail electric customers shall include
consideration of the proposed OREC price schedule (including the proposed
additional OREC prices for a further period of 5 years referenced in Regulation
.02M(3) of this chapter) and proposed OREC amount, the value of energy,
capacity, and ancillary services generated by the proposed project, the value
of avoided Tier 1 REC costs, and any consequential impacts on wholesale market
energy, capacity, ancillary service, and REC prices, to determine the
following:
(i) Whether the projected net rate
impact for applicable classes exceeds the limitations established in Public
Utilities Article, §
7-704.1(e)(1)
(iii)(1) and (2), Annotated Code of Maryland; and
(ii) The forecasted net rate impact to
ratepayers over the initial term of the proposed project;
(b) The quantitative analysis of the economic
impacts on Maryland associated with the proposed project shall assess the
projected impact of the proposed project on in-state income, employment, taxes,
and local spending associated with the project lifecycle including
construction, operations, maintenance, and equipment
purchases.
(3) The
independent analysis of the environmental and health benefits on Maryland
associated with the proposed project, quantitatively expressed in tons of
avoided air emissions and qualitatively expressed in terms of health impacts
associated with avoided air emissions and impacts on the affected marine
environment based on publicly available information.
C. Subject to §B(1)(b) of this
regulation, the Commission shall rank proposed projects (and combinations of
proposed projects, if applicable) based on the qualitative and quantitative
evaluation described by §B of this regulation. The Commission shall not
approve an application that does not meet the requirements of Public Utilities
Article, §
7-704.1(e)(1)(i)
through (iii), Annotated Code of
Maryland.
D. The Commission shall
evaluate all applications received by it prior to the end of the application
period and apply the same evaluation criteria to each application without
discrimination among the applications.
E. The Commission order approving an
application shall be conditional upon completion of the following:
(1) The Commission and the OSW applicant
execute a memorandum of understanding by which the OSW applicant agrees to make
serious, good-faith efforts to interview minority investors in any future
attempts to raise venture capital or attract new investors to the qualified
offshore wind project;
(2) The
Commission and the OSW applicant execute a memorandum of understanding that
requires the OSW applicant to use best efforts and effective outreach to
obtain, as a goal, contractors and subcontractors for the project that are
minority and veteran-owned business enterprises, to the extent practicable, as
supported by a disparity study and as follows:
(a) The memorandum of understanding shall
include a provision whereby the applicant agrees to comply with Public
Utilities Article, §
7-704.1(i)(3),
Annotated Code of Maryland, and develop a tracking methodology to report
workforce diversity in the reports required pursuant to that Article;
(b) The memorandum of understanding shall
include a provision whereby the applicant agrees to develop a tracking
methodology to report its progress establishing and implementing veteran-owned
business enterprise goals and procedures that shall be submitted to the
Commission every 6 months following the issuance of an order approving an OREC
application; and
(c) The memorandum
of understanding shall include a provision whereby the applicant acknowledges
and agrees that the Commission, or a third-party designated by the Commission,
may audit the applicant to verify the applicant's MBE, VSBE, and local business
expenditures and any information provided in reports to the Commission
regarding the implementation of MBE and community benefit plans. The Commission
reserves the right to request additional information from the applicant to
verify reported information;
(3) As described fully by Regulation .06B of this
chapter, the OSW applicant and the Governor's Office of Small, Minority &
Women Business Affairs, in consultation with the Office of the Attorney
General, establish a clear plan for setting minority and veteran-owned business
enterprise participation goals and procedures for the proposed offshore wind
project;
(4) To the extent any
portions of the applicant's plan relate to the criteria set forth in Public
Utilities Article, §
7-704.1(d)(1)
(viii) and (ix), Annotated Code of Maryland, the Commission, the OSW applicant,
and skilled labor organizations shall sign a memorandum of understanding that
requires the applicant to follow such portions; and
(5) Any other conditions the Commission
determines to be appropriate.