Md. Code Regs. 26.11.02.09 - Sources Subject to Permits to Construct and Approvals
A. A person may not construct or modify or
cause to be constructed or modified any of the following sources without first
obtaining, and having in current effect, the specified permits to construct and
approvals:
(1) New Source Review Source (NSR
source), as defined at COMAR
26.11.01.01 a -approval required,
except for electric generating stations that receive a certificate of public
convenience and necessity (CPCN) under Public Utilities Article, §§7-207 and
7-208, Annotated Code of Maryland;
(2) Prevention of Significant Deterioration
(PSD) Source, as defined at COMAR
26.11.01.01 a -approval required,
except for electric generating stations that receive a certificate of public
convenience and necessity (CPCN) under Public Utilities Article, §§7-207 and
7-208, Annotated Code of Maryland;
(3) New Source Performance Standard Source
(NSPS source), as defined at COMAR
26.11.01.01 a - permit to
construct required, except for electric generating stations that receive a
certificate of public convenience and necessity (CPCN) under Public Utilities
Article, §§7-207 and 7-208, Annotated Code of Maryland;
(4) National Emission Standards for Hazardous
Air Pollutants Source (NESHAP source), as defined at COMAR
26.11.01.01 a B(21)(a) - permit to
construct required, except for electric generating stations that receive a
certificate of public convenience and necessity (CPCN) under Public Utilities
Article, §§7-207 and 7-208, Annotated Code of Maryland;
(5) Stationary source of lead that discharges
1 ton per year or more of lead or lead compounds measured as elemental
lead-permit to construct required;
(6) All sources, including installations and
air pollution control equipment, except as listed in Regulation .10 of this
chapter-permit to construct required.
B. In the event of a conflict between the
applicability of §A(1)-(5) of this regulation and an exemption listed in
Regulation .10 of this chapter, the provision that requires a permit
applies.
C. Approval of a PSD or
NSR source by the Department does not relieve the person obtaining approval
from also obtaining all permits to construct required by §A(3)-(6) of this
regulation.
D. General Permits to
Construct. The Department may issue a general permit to construct covering
similar sources, emissions units, or control equipment.
Notes
Regulations .09 adopted effective May 8, 1995 (22:9 Md. R. 648)
Regulation .09A amended effective November 16, 2009 (36:23 Md. R. 1818); December 24, 2012 (39:25 Md. R. 1615)
Regulation .09C amended effective May 4, 1998 (25:9 Md. R. 680)