(1)
Conforming with
248 CMR
10.00. Except as otherwise allowed by a
variance granted by the Board under
248 CMR
3.00:
General Provisions Governing the Conduct
of Plumbing and Gas Fitting Work Performed in the Commonwealth, all
installed plumbing shall conform to the following general requirements as
outlined in
248 CMR
10.00.
(2)
Pitch of Horizontal Drainage Piping.
(a) Horizontal drainage piping shall be run
in straight practical alignment and at a consistent uniform pitch.
(b) Horizontal drainage piping which is three
inches in diameter or smaller shall be installed with a minimum uniform pitch
of 1/4 of an inch per foot.
(c) Horizontal drainage piping which is
larger than three inches in diameter shall be installed with a minimum uniform
pitch 1/8 of an inch per foot.
(d)
Storm or sanitary drain piping may deviate from the above pitch requirements,
provided the pitch produces a computed discharge velocity of not less than two
feet per second. Such piping systems must be designed by a Massachusetts
professional engineer.
(e) Refer to
10.15: Table 2 regarding pitch requirements for a building
drain.
(3)
Changes in Direction of Drainage Piping.
(a)
Allowable
Fittings.
1. Changes in the
direction of drainage piping shall be made with the use of wyes, long sweep
quarter bends, fifth, sixth, eighth or sixteenth bends, or their
equivalent.
2. Quarter bends, or
their equivalent may be used in soil and waste lines when the change in the
direction of the flow is from the horizontal to the vertical.
3. Tees and crosses for vent fittings may be
used for changes in the direction of vent piping only.
4. Short sweep fittings may be used in a
branch waste line when the waste line serves only one outlet and cleanouts are
provided in accordance with
248
CMR
10.08.
(4)
Fittings and Connections
Prohibited.
(a)
Prohibited Fittings.
1. No fitting that incorporates a straight T
branch shall be used as a drainage fitting.
2. No fitting or connection that has an
enlargement chamber or that has a recess with a ledge or shoulder, or that
incorporates a reduction in pipe area shall be used.
3. No running threads, bands or saddles shall
be used in a drainage system.
4. No
drainage pipe or vent piping shall be drilled, tapped, burned, or
welded.
5. Fittings commonly
referred to as "Sisson Joints" are prohibited.
(b)
Obstruction to
Flow.
1. No fitting, connection,
device, or method of installation that obstructs or retards the flow of water,
wastes, sewage, or air in drainage or venting systems where the obstruction
results in flow resistance that is greater than the normal frictional
resistance to flow shall be used unless otherwise specifically indicated
elsewhere in
248 CMR
10.00.
2.
The enlargement of a three-inch closet bend or stub to four inches shall not be
considered an obstruction under
248
CMR
10.05(4)(b) provided
that the horizontal flow line or insert is continuous without forming a ledge.
See 10.05:
Example 1.
10.05: Example 1 - Enlargement of a three-inch Closet
Bend or Flange
Click to
view image
(c)
Heel or Side-inlet
Bends. A heel or side-inlet quarter bend shall not be used as a
dry vent when the inlet is placed in a horizontal position, or any similar
arrangement of pipe and fittings producing a similar effect, except when the
entire fitting is part of a dry vent arrangement.
See 10.05:
Example 2.
10.05: Example 2 - Side-Inlet Bend
Click to
view image
(5)
Trenching, Tunneling and
Backfilling for Storm and Sanitary Systems.
(a)
Trenching and
Bedding.
1. Trenches shall be of
enough width to permit proper installation of the pipe.
2. Where shoring is required, ample allowance
shall be made in the trench's width to facilitate proper working
conditions.
3. Where trenches are
excavated to a grade such that the bottom of the trench forms the bed for the
pipe:
a. care must be exercised to provide
solid bearing between joints; and
b. bell holes shall be provided at points
where the pipe is joined.
4. Where trenches are excavated below grade
such that the bottom of the trench does not form the bed for the pipe, the
trench shall be back-filled to grade with sand tamped in place so as to provide
a uniform bearing surface for the pipe between joints.
5. Where rock is encountered in trenching:
a. The rock shall be removed to a point at
least three inches below the grade line of the trench and the trench shall be
backfilled to grade with sand tamped in place to provide a uniform bearing for
the pipe between joints; and
b. care
shall be exercised to ensure that no portion of the pipe, including its joints,
rests on any portion of a rock.
6. If soft materials of poor bearing
qualities are found at the bottom of the trench:
a. a concrete foundation shall be provided to
ensure a firm foundation for the pipe; and
b. the concrete foundation shall be bedded
with sand tamped in place to provide a uniform bearing for the pipe between
joints.
c. In trenches where a firm
foundation cannot be established, piping shall be properly suspended from the
concrete above.
7. Where
PVC or ABS is installed underground:
a.
Prepare a smooth, uniformly compacted trench bottom using granular fill. Place
the pipe in uniform alignment and grade with a continuous bearing on the bottom
quadrant of the pipe along its entire length.
b. Using granular fill, compact and backfill
around the pipe to a point at least six inches over the crown of the
pipe.
c. Do not allow large stones
or pieces of earth to be dropped into the trench when completing the
backfilling process.
d. The
requirements of
248
CMR
10.05(5)(a)7.a. through
c. shall be the responsibility of the on-site licensed
plumber.
(b)
Tunneling.
1. Where
necessary, pipe may be installed by tunneling or jacking, or a combination of
both. In such cases special care shall be exercised to protect the pipe from
damage either during installation or from subsequent uneven loading.
2. Where earth tunnels are used, adequate
supporting structures shall be provided to prevent future settling or
caving.
3. Pipe may be installed in
a larger conduit that has been jacked through unexcavated portions of the
trench.
(c)
Backfilling.
1.
Until the crown of the pipe is covered by at least two feet of tamped earth
considerable care shall be exercised in backfilling trenches.
2. Loose earth, free of rocks, broken
concrete, frozen chunks and other rubble, shall be carefully placed in the
trench in six-inch layers and tamped in place.
3. Care shall be taken to thoroughly compact
the backfill under and beside the pipe to be sure that the pipe is properly
supported.
4. Backfill shall be
brought up evenly on both sides of the pipe so that it retains proper
alignment.
(6)
Structural Safety.
(a) A structural member of any building shall
not be weakened or impaired by cutting, drilling or notching.
(b) Any cutting, drilling, or notching shall
be completed in compliance with the local Inspector of buildings or as
specified in 780 CMR: The Massachusetts State Building
Code.
(7)
Protection of Piping.
(a)
Corrosion. Any
pipe that is in contact with or that passes through or under a masonry product,
concrete product or any other similar and potentially corrosive material shall
be protected against external damage by application of a protective sleeve,
coating, wrapping, or other means that will prevent corrosion.
(b)
Freezing
Prevention.
1. For water supply
or drainage piping that is installed outside, under a building, exposed to the
elements, in an unheated area, in an exterior wall, unconditioned space or
similar areas that may be directly influenced by freezing temperatures,
adequate provision shall be made to protect all pipes from freezing.
2. The protection and covering of water and
waste pipes shall be the responsibility of the installing
plumber.
(c)
Rodent Proofing.
1.
All strainer plates on drain inlets shall be designed and installed so that the
diameter of the opening is no greater than or equal to V2 inch.
2. Meter boxes shall be constructed in such a
manner that rodents cannot enter a building by following the water service pipe
from the box into the building.
(d)
Physical Damage.
1.
Exposed Piping.
All exposed drainage piping, vent piping, or water piping in parking garages,
in residential garages, warehouses or similar type buildings must be protected
against physical damage from all types of vehicles such as automobiles, carts,
pallet jacks or forklifts.
2.
Concealed Piping. All water, waste, and vent piping
other than cast/ductile iron, or any steel located within one inch of exposed
framing shall be protected by steel shielding plates of not less than 18 gauge
in thickness. Plates shall extend a minimum of two inches beyond the
piping.
(e)
Protection against Thermal Expansion. Protection of
piping shall be provided as warranted by temperature variations or physical
conditions. Protection of PVC against thermal expansion shall be provided using
expansion joints or loops when temperature variations exceed the piping
material's coefficient of linear expansion, the length of pipe between
directional changes, and the temperature differential.
(f)
Non-Metallic Piping Through
Firewalls or Rated Fire Separation Walls.
1. When piping passes through a rated fire
separation wall or enclosure to another dwelling unit or space, the pipe shall
be encased or shielded by a metal sleeve extended twenty inches on each side of
the wall, floor, or ceiling. The metal sleeve shall be 18 gauge (.040 in.) or
heavier.
2. The annular space
between the metal sleeve and the piping shall be sealed with non-combustible
fire-retardant material, alternate procedures may be used. To the extent
applicable, see 780 CMR: The Massachusetts State
Building Code for licensing and other requirements governing such
issues.
3. The piping connections
that penetrate firewalls and ceilings in one- and two-family passenger car
garages located beneath dwelling units are exempt and are not required to be
encased. The pipe penetrations should be sufficiently sealed by means of
caulking or other approved materials to prevent the passage of smoke from space
to space.
(8)
Damage to the Public or Private Sewer Systems. No
person shall discharge by any mean into a building drain or sewer the following
matter:
(a) ashes;
(b) masonry products;
(c) textiles;
(d) paints;
(e) solvents;
(f) flammables;
(g) corrosive or explosive
liquid(s);
(h) gas;
(i) oil;
(j) grease; or
(k) any product that would or could obstruct
or damage a drain or sewer system.
(9)
Detrimental
Wastes. Waste that is detrimental to the public sewer system or to
the functioning of the sewage treatment plant shall be treated and disposed of
according to the requirements of the State, local or Federal authorities having
jurisdiction.
(10)
Sleeves. The annular space between the sleeve and a
pipe that passes through an exterior wall shall be made watertight or weather
tight.
(a) PVC or ABS piping which penetrate
concrete floors, slabs or walls shall be provided with sleeves. Maintain an
annular space of one inch between the pipe and sleeve.
(b) PVC or ABS Pipes which penetrate concrete
slabs placed on grade shall also provide a sleeve. Maintain an annular space of
one inch between the pipe and sleeve.
(11)
Second Hand or Previously
Installed Plumbing Material. If installation of second hand or
previously installed plumbing fixtures or materials complies with
248 CMR
10.00, before installation that fixture or material
shall be thoroughly cleansed and disinfected.
(12)
Piping in Relation to
Footings.
(a)
Outside
of Footings. Piping which is installed outside of and below a
footing shall not destroy the bearing value of the soil.
(b)
Through or Under Footings,
Foundations or Walls. No pipe shall be installed through or under
a footing, foundation, or wall, except when a provision is made in the footing
to carry the building or structural loads without transmitting such loads to
the pipe.
(13)
Drainage Below Sewer Level. Drainage piping which is
located below the sewer shall be installed as provided in
248
CMR
10.15(9)
(14)
Connections to Plumbing
System Required. All plumbing fixtures, drains and appurtenances
which are used to receive, or discharge liquid waste or sewage waste shall be
properly connected to the sanitary or storm drainage system of the building or
premises in accordance with the requirements of
248 CMR
10.00.
(15)
Sewage Disposal Connections
(Buildings).
Each building shall have an independent connection to a public
sanitary sewer or sewage disposal system that complies with
310 CMR
15.00. The State Environmental Code, Title 5:
Standard Requirements for the Siting, Construction, Inspection, Upgrade and
Expansion of On-site Sewage Treatment and Disposal Systems and for the
Transport and Disposal of Septage.
(16)
Location of
Fixtures.
(a)
Light
and Ventilation: Plumbing fixtures shall be located in
compartments, rooms, spaces or areas that are provided with mechanical
ventilation and illumination that conform to
105 CMR
410.000:
Minimum Standards of Fitness for
Human Habitation (State Sanitary Code, Chapter II) and 780
CMR
: The Massachusetts State Building Code.
(b)
Improper
Location: Piping, fixtures, or plumbing devices and equipment
shall not be installed in a manner that will interfere with the normal
operation of windows, doors, or other openings.
(17)
Workmanship.
Workmanship shall conform to generally accepted good practice. Particular
attention shall be applied to all piping installations with regards to the
alignment of piping (straight, level, and plumb).
(18)
Manufacturer
Instructions: The licensee shall conform to the equipment
manufacturers' specific requirements in completing an installation unless those
requirements conflict with or are less stringent than
248 CMR
10.00.
(19)
Temporary and Emergency
Uses.
(a)
General. Where a new or existing building or structure
is desired for use on a temporary or emergency basis but whose plumbing does
not comply with
248 CMR
10.00, the Inspector may approve said use on a
temporary basis so long as the following provisions are adhered to:
1. No relief shall be granted unless a
plumbing permit application has been filed. In cases of emergency requiring an
immediate use of a building or structure to protect public health, safety, and
general welfare and where the prospective permit applicant is unable to contact
the Inspector, the use shall be allowed so long as the requirements of
248
CMR
3.05(1)(a)4. are adhered
to.
2. With the permit application,
the applicant must submit in writing a description of the temporary or
emergency use as well as the reason why compliance with
248 CMR
10.00 cannot be achieved prior to that use.
3. The uniform application for a permit to
perform plumbing work must be filled out to show all areas of plumbing work
which would be required for full compliance with
248 CMR
10.00, regardless of whether the applicant intends to
complete that work prior to the end of the temporary use.
4. The Inspector shall not grant temporary or
emergency approvals for the following:
a. A
building which has no toilets or lavatories;
b. A building which is prohibited from being
utilized due to an order by a building or fire official or a court of competent
jurisdiction;
c. Allowing a use
which has previously been denied by the Inspector and/or the Board;
and
d. Any other uses which, in the
opinion of the Inspector, would jeopardize public health, safety, or general
welfare.
5. The Inspector
shall authorize temporary, or emergency uses by issuing said authorization in
writing in such format as deemed appropriate by the Inspector and shall
accompany a permit to perform plumbing work to allow the applicant to achieve
code compliance. Said authorization shall not be permitted for more than 60
days. Further extensions must be granted by the Board by way of the variance
process.
(b)
Failure to Obtain Inspector or Board Approval of a Temporary or
Emergency Use.
As described in
248
CMR 10.02(27), the use of a
building or structure that is not in compliance with
248 CMR
10.00 represents a significant danger to public
health. Accordingly, any such building or structure whose use has not been
approved by the Board or by the Inspector pursuant to
248
CMR 10.05(19) shall be
deemed unsafe for occupants regardless of the nature of deficient/missing
plumbing. This applies even if the violation is minor or created by a change of
use not accompanied by any plumbing work. Until such issues are
corrected:
1. Permits for any and all
additional work shall be denied per
248
CMR
3.05(1)(b)10.g.;
and
2. Inspectors shall not sign
off on requests by other officials (such as building officials) regarding the
safety of the building or structure for occupancy or other
purposes.
(c)
Additional Relief. Notwithstanding the requirements of
248
CMR
10.05, where there is a hardship or
unusual circumstance not addressed in
248
CMR
10.05, the Board retains the right to
issue variances as it deems appropriate pursuant to
248
CMR
3.04(2).