310 CMR, § 15.020 - Disposal System Construction Permits
(1) No
person shall construct, upgrade, modify or expand a system without a Disposal
System Construction Permit which has been issued by the Approving Authority
after the site evaluation set forth in
310 CMR 15.100
through
15.107
has been completed. In the event it is discovered during installation of the
system that site conditions differ from those contained in the site evaluation
and/or the approved design plans, the originally issued Disposal System
Construction Permit is void, installation shall stop, and the applicant shall
reapply for a new Disposal System Construction Permit. Except for subdivisions
entitled to M.G.L. c. 111, § 127P protection, M.G.L. c. 40B comprehensive
permit land, and large systems with approved plans or pursuant to a variance
issued by the Department in accordance with
310 CMR
15.414, a Disposal System Construction Permit
shall not authorize increased design flow which would bring the total design
flow to 10,000 gpd or greater. Disposal System Construction Permits shall be in
a form approved by the Department.
(2) Construction of all systems for which a
Disposal System Construction Permit application has been approved by the local
Approving Authority and/or the Department shall be completed, and the
Certificate of Compliance obtained within three years of issuance of the final
approval. Unless an extension pursuant to 310 CMR 15.020(3) is issued, the
permit, and any variances or local upgrade approvals from
310 CMR 15.000 allowed
therewith, shall expire if the work authorized by it is not completed within
the three-year period.
(3) The
local Approving Authority or the Department may issue a written one year
extension to the Disposal System Construction Permit required by 310 CMR
15.020(1) upon written request of the permittee, filed before the expiration
date, and documenting the facts that prevent completion of the approved system
within the time of the original permit. Only one extension may be
granted.
(4) The local Approving
Authority shall not issue a Disposal System Construction Permit until any
approval(s) required by the Department pursuant to
310 CMR 15.000 have been
issued.
(5) Any person required to
obtain a permit pursuant to
310 CMR 15.000 shall
complete and submit the appropriate application forms to the Approving
Authority. As part of an application for a permit or approval, the Approving
Authority may require the applicant to provide information and analyses as it
may reasonably require to determine whether such applicant meets the
requirements of
310 CMR 15.000.