310 CMR, § 19.142 - Landfill Post-closure Requirements
(1)
General. The owner, successors or assigns shall
maintain, care for and monitor the site during the post-closure period in order
to ensure the integrity of the closure measures and to detect and prevent any
adverse impacts of the site on public health, safety or the
environment.
(2)
Post-closure Period. For the purposes of 310 CMR
19.142 the post-closure period shall extend for a minimum of a 30 year
period.
(3)
Post-closure Period Waiver. The Department may, upon
request, reduce the post-closure period to less than 30 years if it finds that
a shorter period will be sufficient to protect public health, safety, and the
environment. The Department's review will include, but not be limited to, a
consideration of the quantity and quality of leachate generated by the
landfill, ground water monitoring results, characteristics of the waste
disposed, stability of the waste, design of the facility and location of the
site.
(4)
Post-closure
Period Extension. The post-closure period may be extended by the
Department at any time prior to the time that the post-closure period is due to
expire where the Department finds an extension is necessary in order to ensure
protection of public health, safety or the environment or to mitigate adverse
impacts.
(5)
Post-closure Requirements. During the post-closure
period the owner or operator (or successors or assigns thereto) shall perform
the following activities on any closed portion of the facility:
(a) take corrective actions to remediate
and/or mitigate conditions that would compromise the integrity and purpose for
the final cover;
(b) maintain the
integrity of the liner system and the final cover system;
(c) collect leachate from and monitor and
maintain leachate collection system(s);
(d) monitor and maintain the environmental
monitoring systems for surface water, ground water and air quality;
(e) maintain access roads;
(f) maintain landfill gas control
systems;
(g) protect and maintain
surveyed benchmarks; and
(h) have
the landfill inspected by a third-party inspector in accordance with
310 CMR
19.018 and such third-party inspection shall
be conducted in accordance with the frequency and other requirements of
310 CMR
19.018, unless more frequent inspections or
more stringent requirements are contained in the terms of any approval, order
or other document issued by the Department pursuant to 310 CMR
19.000.
(6)
Inspection Requirements. The owner, operator,
successor or assigns shall have the facility inspected by a third-party
inspector in accordance with
310 CMR
19.018.
(7)
Additional
Measures. The owner, successors or assigns shall institute such
additional measures during the post-closure period as the Department deems
necessary for the protection of public health or safety or the
environment.
(8)
Termination of the Post-closure Period. The
post-closure period shall end on the date of the Department's written
determination that the post-closure care, maintenance and monitoring of the
site are no longer required. Said written determination in no way limits or
absolves the owner of liability for the site in the future.