310 CMR, § 80.44 - Requirements for a Tank within a Tank
If a new tank is installed inside an existing tank, the Owner shall:
(1) Prior to installing the new
tank, the Owner or Operator shall have all the solid and liquid material
removed from the existing UST system, in accordance with
310 CMR
80.47, have the existing UST system rendered
inert and shall secure all openings. The Owner or Operator shall manage and
dispose of all solid and liquid material removed from the UST system in
accordance with all applicable federal, state and local laws and
regulations.
(2) Conduct an
assessment in accordance with
310 CMR
80.43(4) before the new
tank is installed. If the assessment finds contamination requiring notification
pursuant to 310 CMR 40.0000: Massachusetts Contingency Plan,
the installation of the new tank shall not commence until the Owner or Operator
has complied with the notification requirements contained in
310
CMR 40.0300: Notification of Releases
and Threats of Release of Oil and Hazardous Materials; Identification and
Listing of Oil and Hazardous Materials, as applicable, and any
required response actions under 310 CMR 40.0000.
(3) Notify the Department that a new tank is
being installed inside an existing tank, in a format specified by the
Department, within 30 days of the new tank being installed. A copy of the
assessment in
310 CMR
80.43(4) shall be submitted
with said form.