963 CMR 2.08 - Reconstruction, Renovation and Repair Projects

Current through Register 1466, April 1, 2022

(1) Reconstruction, renovation and repair projects may be considered by the Authority pursuant to the Application process promulgated in 963 CMR 2.00.
(2) Any Approved Project for the reconstruction, renovation, or repair of an existing school facility shall be subject to a determination by the Authority that such reconstruction, renovation or repair has a life-cycle cost analysis that demonstrates the cost-effectiveness and useful life of said reconstruction, renovation or repair.
(3) The space standards contained in 963 CMR 2.00 and in the MSBA Educational Program Space Standards and Guidelines may not necessarily be applicable to reconstruction, renovation or repair projects. These standards and guidelines were developed by the Authority for determining maximum size and costs related to new construction and should not be used for assessing safety standards or educational adequacy of existing facilities that were constructed in accordance with the standards and guidelines that prevailed at the time of construction. The Authority shall consider proposed reconstruction, renovation and repair projects on a case-by-case basis and in some cases different square footage calculations may be determined at the discretion Authority.

Notes

963 CMR 2.08

The following state regulations pages link to this page.



State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.