974 CMR, § 10.09 - Construction Requirements
All facilities erected, constructed or within the DEZ and associated wiring shall comply with the following:
(1) Be certified by a qualified and licensed
professional engineer as to:
(a)
Tower Design.
(b) Compliance with Federal Communications
Commission, Federal Aviation Administration, Massachusetts Aeronautics
Commission, Massachusetts Department of Public Health and American National
Standards Institute Standards.
(c)
Conformance with accepted electrical engineering methods and practices and the
National Electrical Code.
(d) Non-interference with present users and
facilities.
(2) All
signal and remote control conductors of low energy extending substantially
horizontally above the ground between a tower or antenna and a structure, or
between towers, shall be at least eight feet above the ground at all points,
unless buried underground.
(3)
Metal towers shall be constructed of, or treated with, corrosive resistant
material. Wood structures shall be impregnated with rot resistant substances.
All facilities and structures associated with them shall comply with 780 CMR:
The Massachusetts State Building Code.
(4) Towers and antennas shall be designed,
using the best available technology, to blend into the surrounding environment
through the use of color and camouflaging architectural treatment, except in
instances where the color is dictated by federal or state authorities such as
the Federal Aviation Administration.
(5) Facilities mounted on buildings or water
tanks shall be painted or constructed of materials to match the color of the
building material directly behind them.
(6) No facility may have affixed or attached
to it in any way, except during time of repair or installation, any lights,
reflectors, flashers, or other illuminating device, exceptas required bythe
Federal Aviation Agency or the Federal Communications Commission. Lighting of
equipment structures and any other facilities on site shall be shielded from
abutting properties. There shall be total cutoffofalllight at the property
lines of the property to be developed, and foot-candle measurements at the
property line shall be 0.0 initial foot-candles when measured at
grade .
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.