Minn. R. 1335.2500 - FLOODPROOFING REGULATIONS, SECTION 1302.2.2
FPR section 1302.2.2 is amended to read as follows:
Where the state of dryness of a space is dependent on a sump pump system, or where the stability of a structure during a flood event depends on the relief of uplift pressures on building components, all interior storm water drainage or seepage, appliance drainage, and underslab drain tile systems shall be directly connected to a sump (pump) and discharged at an elevation at least three feet above the RFD.
Notes
Statutory Authority: MS s 104.05
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.