37 Miss. Code. R. § 1-7501-04002-402 - Pipelines
1. Applications for permits to construct
pipelines, including service connections, on state highway rights of way by
companies or associations will be made on the following forms, as applicable:
a) Form MND-002 "Application For Permit To
Construct Pipeline Along Or Across State Highway And Agreement Of Applicant
Given In Consideration Of Said Permit" (Must be letter size paper-8.5 x
11)
b) Form MND-005 "Supplement to
Forms MND-002, and MND-004" (Must be legal size paper-8.5 x 14 or half scale-11
x 17)
c) Form MND-002-Attachment A
"Jacking, Dry Boring, Boring with Drilling Fluid, Tunneling and Directional
Boring" (If necessary, must be letter size paper 8.5 x 11)
d) Form MND-603 "Performance Bond" (If
required by the District Engineer, must be letter size paper-8.5 x
11)