10 CSR 40-4.080 - Previously Mined Areas
(1) Remining operations on previously mined
areas that contain a preexisting highwall shall comply with the requirements of
10 CSR 403.110 or 10 CSR 40-4.040, except as
provided in this rule.
(2) The
requirements of 10 CSR 40-3.110(1)(B) and
(2)(A) requiring the elimination of highwalls
shall not apply to remining operations where the volume of all reasonably
available spoil is demonstrated in writing to the regulatory authority to be
insufficient to completely back fill the reaffected or enlarged highwall. The
highwall shall be eliminated to the maximum extent technically practical in
accordance with the following criteria:
(A)
All spoil generated by the remining operation and any other reasonably
available spoil shall be used to backfill the area. Reasonably available spoil
in the immediate vicinity of the remining operation shall be included within
the permit area;
(B) The backfill
shall be graded to a slope which is compatible with the approved post-mining
land use and which provides adequate drainage and long-term
stability;
(C) Any highwall remnant
shall be stable and not pose a hazard to the public health and safety or to the
environment. The operator shall demonstrate, to the satisfaction of the
regulatory authority, that the highwall remnant is stable; and
(D) Spoil placed on the outslope during
previous mining operations shall not be disturbed if the disturbances will
cause instability of the remaining spoil or otherwise increase the hazard to
the public health and safety or to the environment.