Mont. Admin. r. 36.25.234 - SEISMOGRAPH PLUGGING AND ABANDONMENT
(1)
Except as hereinafter provided, all seismic holes shall be plugged as soon
after being utilized as reasonably practicable; however, in no event shall they
remain unplugged for a period of more than 120 days after being drilled and
shot.
(2) The permittee shall
notify the department, in writing, of its intent to plug and abandon, including
the date such activities are expected to commence, the location by section,
township, and range of the holes to be plugged and the name and telephone
number of the person in charge of the plugging operations.
(3) All seismic shot holes shall be plugged
in accordance with the board of oil and gas conservation rules. All cuttings
not placed in the hole shall be spread out over the surrounding area at a depth
not to exceed 1 inch.
(4) If an
artesian water flow is encountered in any of the drill holes located on state
land, the permittee shall immediately notify the department so that a decision
can be made by the department as to whether the well will be developed. The
department shall make a decision within 24 hours of notification. If the well
is not developed, or if damage is occurring or is imminent, it is the
permittee's responsibility to plug the hole with cement of sufficient density
to contain the waters to their native strata as required by the board of oil
and gas con- servation rules. If a nonflowing aquifer is encountered in any of
the drill holes on state land, the permittee shall notify the department in
writing of the location and depth.
(5) The permittee shall leave the land
covered by the permit in as nearly the same condition as it was prior to the
effective date of the permit as is practically possible. All refuse, including,
but not limited to, oil cans, shot wire, powder boxes, flagging, cement or mud
sacks, stakes, and primacord shall be removed from the lands and shall be
properly disposed of by the permittee.
(6) A seismic shot hole may be left unplugged
at the request of the surface lessee or owner for conversion to a fresh water
well provided the surface lessee or owner executes a release on a form provided
by the department relieving the permittee from any liability for damages that
may thereafter result from the hole remaining unplugged.
Notes
77-3-402, MCA; IMP, 77-3-401, MCA;
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.