122 Neb. Admin. Code, ch. 22, § 001
Based on a site specific assessment of the potential for fluid movement from the well or injection zone and on the potential value of monitoring wells to detect such movement, the Director shall require the owner or operator of a Class I well to develop a monitoring program. At a minimum, the Director shall require annual monitoring of the pressure buildup in the injection zone including at a minimum, a shut down of the well for a time sufficient to conduct a valid observation of the pressure fall-off curve.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.