135 Neb. Admin. Code, ch. 6, § 001
On or before March 31, of each calendar year, the operator conducting the exploration shall submit to the Director a report on all activities conducted from January 1 through December 31 of the previous year including:
001.01 The date of
completion of plugging of each hole;
001.02 A plat or map at a scale, approved by
the Department prior to the submittal of the report, showing the location of
each mineral exploration hole;
001.03 For holes having artesian flow at the
surface, the estimated rate of flow; and
001.04 A geophysical description which shall
include:
001.04A A lithologic description of
each hole comprising:
001.04A1 Identification
of aquifers and the formation penetrated, excluding information regarding
mineral occurrence or zonation.
001.04A2 A representative sample of any
mechanical, electrical, or radiological survey logs but upon request, the
permittee shall make available all logs existing for the permit area.
001.04A3 Any permittee shall have available
upon request any geophysical data regarding the hole.
001.04B A description of the plugging
techniques used:
001.04B1 When abandonment
mud is used to plug the exploration hole, a a description of each hole shall
include the viscosity of the mud when the exploration hole reached bottom, the
trade name of the plugging mud utilized, and the final viscosity of the
plugging mixture.
001.04B2 When
cement is used to plug the exploration hole, a description of the cement grout
mixture shall be included.
001.05 The permittee shall furnish a list of
surface owners, the holes drilled on each owner's land and the owner's address
and telephone number.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.