Nev. Admin. Code § 445A.735 - Proposed pollution control projects: Contents of facility plan
A facility plan for a proposed pollution control project must include:
1. A description of the
nonpoint sources of pollution and the areas and waters affected by
them.
2. A description of the best
management practices considered.
3.
A cost-effect analysis of the feasible conventional, innovative and alternative
management practices, processes and techniques capable of meeting the
applicable effluent, water quality and public health requirements over the
design life of the project while recognizing environmental and other
nonmonetary considerations.
4. An
environmental information document that includes an adequate evaluation of the
environmental impacts of alternatives. This evaluation must discuss all
significant environmental effects of the proposed project and the implications
of the project with respect to:
(a) Threatened
or endangered species;
(b)
Wetlands;
(c) Farmland;
(d) Fish and wildlife;
(e) Cultural resources;
(f) Open spaces;
(g) Environmentally sensitive
areas;
(h) Air quality;
(i) Water quality;
(j) Consistency with land use
plans;
(k) Energy use;
(l) Long-term versus short-term
trade-offs;
(m) Floodplains;
and
(n) Consistency with areawide
planning, such as basin plans and plans prepared pursuant to section 208 of the
Act,
33 U.S.C. §
1288, and the nonpoint source management
program.
5. For the
selected alternative, a concise description at an appropriate level of detail
of:
(a) Relevant design parameters.
(b) Cost effects on users of the wastewater
system.
(c) Institutional and
management arrangements required for successful implementation of the
project.
(d) Estimated costs for
capital construction, operating and maintenance costs and costs for debt
service costs and a description of the manner in which local costs are to be
financed, including a preliminary revenue program in the form prescribed by the
Division.
(e) Estimated costs of
future expansion and long-term needs for reconstruction of facilities following
their design life.
6. A
summary of public participation in the development of the facility
plan.