Nev. Admin. Code § 477.830 - Submission of plans and specifications; corrected plans; certification of results of hydrostatic tests
1. Before
installing or remodeling a fire standpipe system, the owner of the system shall
submit to the authority having jurisdiction:
(a) Design specifications for the
system;
(b) A list of materials to
be used in the system;
(c) Scale
drawings of the remodeling or installation which:
(1) Can be easily reproduced; and
(2) Are of sufficient detail to enable the
authority having jurisdiction to evaluate the effectiveness of the
system;
(d) A schedule
of tests required by the appropriate code; and
(e) Calculations for the flow of water for
the proposed system.
2.
When substantial change has been made in the plans approved by the authority
having jurisdiction for the construction or remodeling of the system, a
corrected plan depicting the system as it was built must be submitted, with the
appropriate fees, to the authority having jurisdiction for approval within 10
days after the completion of the system.
3. The results of hydrostatic tests of the
system must be certified to the authority having jurisdiction and the owner in
writing.
Notes
NRS 477.030
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.