Nev. Admin. Code § 534.4376 - Instrumentation boreholes

1. An instrumentation geotechnical soil boring may be drilled by an unlicensed well driller.
2. The installation of monitoring instruments and simultaneous plugging must be:
(a) Completed by a well driller who is licensed in this State; or
(b) Supervised and documented by the responsible project geologist, hydrologist or engineer.
3. An instrumentation geotechnical soil boring must be permanently plugged at the time of completion pursuant to NAC 534.4371.
4. Documentation of each instrumentation geotechnical soil boring must be completed and maintained pursuant to NAC 534.4369.

Notes

Nev. Admin. Code § 534.4376
Added to NAC by St. Engineer by R039-12, eff. 6-29-2012; A by R068-20A, eff. 12/29/2020; A by R068-20CAP, eff. 6/23/2021
NRS 534.020, 534.060, 534.110

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.