Nev. Admin. Code § 623A.440 - Instruments of service; official stamp
1. All submitted
instruments of service, including, without limitation, landscape architectural
plans, specifications, reports, papers and other professional documents
relating to the practice of landscape architecture, must be stamped, signed and
dated pursuant to the provisions of subsection 3 by the registrant who prepared
them or provided the direct supervision under which they were
prepared.
2. If a submitted
instrument of service, including, without limitation, a landscape architectural
plan, specification, report, paper or other professional document relating to
the practice of landscape architecture, is prepared by a person other than a
registrant, the submitted instrument of service must contain the name and
registration number of the registrant who provided the direct supervision under
which the submitted instrument of service was prepared.
3. A registrant shall use the original stamp
provided by the Board pursuant to NAC 623A.140 and place his or her original
signature, the date of execution and the expiration date of the registration
across the stamp, on the front page of the work prepared by him or
her.
4. If a professional document
contains the product of more than one design professional, the registrant must
stamp, sign and date the document pursuant to the provisions of subsection 3
and add a notation which clearly denotes the sheets that he or she
prepared.
5. Details, shop
drawings, product descriptions and other product information prepared by a
manufacturer, supplier or installer of a specific product or system may be
integrated into documents prepared, stamped, signed and dated pursuant to the
provisions of subsection 3 by a registrant if the details, drawings,
descriptions or other information are incidental to the overall scope of the
project and do not, in themselves, describe spaces, elements or systems which
directly affect the public health, safety and welfare.
Notes
NRS 623A.130, 623A.195
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.