Nev. Admin. Code § 624.72514 - Order for corrective action: Determination of time permitted for compliance
In determining the time permitted for compliance with an order for corrective action issued pursuant to NRS 624.341, the Board or its designee will determine the time for compliance with the order by considering, without limitation:
1. The accepted industry
practice regarding the performance of the work necessary to comply with the
order for corrective action, in the climate or weather conditions of the area
in which the construction project is located.
2. The number of days during which the owner
of the construction project will make the site of the construction project
available for the contractor to comply with the order for corrective
action.
3. The time necessary to
obtain materials required for the contractor to comply with the order for
corrective action.