N.H. Admin. Code § Env-Dw 505.05 - Required Reports
(a) All suppliers identified in
Env-Dw
505.02(a) shall submit an annual
inspection and testing report to the department in accordance with this
section.
(b) The annual inspection
and testing report shall be submitted to the department no later than April 1st
of the year following the inspection year.
(c) The annual inspection and testing report
shall:
(1) Specify the total number of
permitted cross connections that existed at the water system at the end of the
year for which the report is being filed; and
(2) Provide the following information for
each backflow prevention device:
a. The
permit number of the backflow prevention device;
b. The name of the owner of the backflow
prevention device;
c. The location
of the backflow prevention device;
d. The date of each inspection and test
performed during the year of reporting;
e. The name, certifying organization, and
certification number of the certified backflow prevention device inspector who
performed the inspection and test on the device;
f. The result of each inspection and test;
and
g. If the inspection or test
result is unsatisfactory, the date at which the backflow prevention device was
found to be satisfactory following a subsequent inspection and test in that
calendar year period.
Notes
(See Revision Note at part heading for Env-Dw 505) #10615, eff 6-1-14
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.