N.H. Admin. Code § Pas 305.01 - Requirements for Manufacturers to Pre-Certify Tows, Carousels, and Conveyors
(a) The manufacturer shall submit the
appropriate application form listed below. When completing the application form
for pre-certification purposes, the manufacturer shall indicate
"pre-certification" in lieu of site specific information.
(b) For a rope tow, a manufacturer shall
request pre-certification by submitting a completed form Pas 1 "Application for
New Construction, Alteration in Length, Relocation, or Modification and
Registration of Fiber Rope Tow or Wire Rope Tow", as revised 1/2022.
(c) For a conveyor or carousel, a
manufacturer shall request pre-certification by submitting a completed form Pas
2 "Application for New Construction, Alteration in Length, Relocation, or
Modification and Registration of Conveyor or Carousel", as revised
1/2022.
(d) For pre-certification
of tows, carousels, and conveyors, the design shall be suitable for
installation at any location without modification of any structures, electrical
system, mechanical system or hydraulic system.
(e) Installation procedures shall be the same
for all sites except for the length or number of carriers that might vary at
different locations.
Notes
#2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1005.01)
New. #4862, eff 7-10-90; amd by #6020, eff 4-14-95; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10
New. #10072, eff 1-11-12
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.