N.H. Admin. Code § Pas 305.02 - Application for Construction, Relocation, or Alteration in Length of Passenger Tramways

(a) Before the construction of any new passenger tramway, relocation, or alteration in length of a passenger tramway, the area operator shall submit to the board a profile of the lift line and a plan showing proximity of power lines, structures, woods, highways, and rivers. The plan and profile shall be submitted along with the appropriate application as specified in (c) below, for the type of lift to be constructed, relocated, or altered in length.
(b) The operator shall not proceed with construction, relocation, or alteration in length unless:
(1) He or she has received approval from the board; or
(2) The board has not responded within 30 days of receipt of the application.
(c) Before any passenger tramway construction, relocation, or alteration in length is started, owners or area operators shall apply for the board's approval using the application that correlates to the type of lift to be constructed, relocated, or altered in length, as described in Pas 305.03, Pas 305.04 and Pas 305.05.

Notes

N.H. Admin. Code § Pas 305.02

#2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1005.02)

New. #4862, eff 7-10-90; ss by #6020, eff 4-14-95; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10

New. #10072, eff 1-11-12; amd by #10382, eff 7-23-13

Amended by Volume XL Number 7, Filed February 13, 2020, Proposed by #12989, Effective 2/5/2020, Expires 2/5/2030. Ss by #13429-B, Effective 8/6/2022 (see Revision Note #2 at chapter heading for Pass 300).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.