(a) Before any
concrete is poured for either terminal or tower foundations, the tramway
inspector shall be notified at least 48 hours prior to the expected date and
time of pouring.
(b) If the
required notice has been given pursuant to (a) above, the pouring may be
carried out in the absence of a tramway inspector or another representative of
the board.
(c) Two sample cylinders
of concrete from each truckload, or from each batch if on site mixing is done,
shall be tested to ascertain that the compression strength of the concrete
meets the minimum requirements of the designer. The area operator shall be
responsible for having the test done and shall submit a record of such test to
the board.
Notes
#7800, eff 12-11-02; amd by #9354-B, eff 1-3-09; ss by #10072, eff 1-11-12; amd by #10382, eff 7-23-13
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.