N.H. Admin. Code § Pas 306.01 - Initial Registration of a New Construction, Relocated, Altered in Length, or Modified Passenger Tramway

(a) Prior to initial registration of a new construction, relocated, altered in length, or modified passenger tramway, the following shall be completed and submitted to the board:
(1) A stamped certificate from the designer with original signatures that the lift meets all requirements set forth by statute and these rules;
(2) The acceptance test and inspection;
(3) A certified copy of the results of a destruction test of the wire rope conducted by the manufacturer or a laboratory;
(4) The evacuation plans for an aerial lift; and
(5) Certification from a qualified engineer that the lift conforms to the designer's plans, except for fiber rope tows.
(b) Within 60 calendar days after the acceptance test, certified as-built plans shall be completed and delivered to the owner and the tramway board.

Notes

N.H. Admin. Code § Pas 306.01

#2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1006.01)

New. #4862, eff 7-10-90; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10

New. #10072, eff 1-11-12; amd by #10382, eff 7-23-13

Ss by #13429-B, Effective 8/6/2022 (see Revision Note #2 at chapter heading for Pas 300).