N.H. Admin. Code § Pas 306.02 - Initial Registration Requirements for Fiber Rope or Wire Rope Tows
(a) To register
the new construction, relocation, altered in length, or modification of fiber
rope tows or wire rope tows, the following shall be submitted to the board
along with the form Pas 5 "Tramway Application / Registration Certificate",
revised 1/2022:
(1) Certificate from designer
with original signatures and drawings submitted to the board within 30 days of
the acceptance test;
(2) Completed
acceptance test and inspection;
(3)
Wire rope test certificates submitted to the board for the following:
a. Haul rope;
b. Tensioning rope; and
c. Stay ropes;
(4) On-site operations manual;
(5) On-site maintenance manual; and
(6) Documentation that any variances required
have been granted.
(b)
The operator shall sign the completed Pas 5 form under penalty of unsworn
falsification pursuant to
RSA
641:3.
Notes
#2297, eff 2-7-83; ss by #2704, eff 5-9-84, EXPIRED 5-9-90 (formerly Saf-S 1006.02)
New. #4862, eff 7-10-90; ss by #6284, eff 7-10-96; ss by #7800, eff 12-11-02, EXPIRED: 12-11-10
New. #10072, eff 1-11-12
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.