N.H. Admin. Code § Puc 902.13 - Facility

"Facility" means the electricity generating equipment, powered by renewable energy or that employs a heat led combined heat and power system, interconnected with the electric distribution system through any one retail meter or more than one retail meter, installed or to be installed in accordance with Puc 903.03.

Notes

N.H. Admin. Code § Puc 902.13
#9998, eff 9-20-11 (from Puc 902.08); ss by #10502, INTERIM, eff 1-3-14, EXPIRED: 7-2-14 (from Puc 902.10); New. #10757, eff 1-8-15 (from Puc 902.12); Amended by Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030 (formerly Puc 902.09)

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.