N.H. Admin. Code § Puc 908.07 - Utilities Shall Report Number and Size of Net-Metered Facilities
(a) Each distribution utility shall:
(1) Track the number and size of net-metered
facilities interconnected to their distribution systems;
(2) Report to the commission annually by
April 1 of each year for the prior year, the following information regarding
net-metered facilities:
a. The number of
facilities operating;
b. The
generation output rating of the facilities in kilowatts; and
c. Information regarding any net-metered
combined heat and power facilities.
Notes
#7424, eff 1-12-01; ss by #9353, INTERIM, eff 1-12-09, EXPIRED: 7-11-09
New. #9515, eff 7-18-09; ss by #9998, eff 9-20-11
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.