N.H. Admin. Code § Puc 909.09 - Application to Register or Re-Register as a Host
(a) An applicant
for registration or re-registration as a host shall provide to the commission,
with a copy to the distribution utility, the following information:
(1) The host's name, trade name, if any,
address, service address, telephone number, email address, website address, if
any, name of distribution utility, meter number, and account number;
(2) The name, telephone number, and email
address of the individual responsible for responding to commission
inquiries;
(3) The identity of the
owner and operator of the facility;
(4) A list of all members in the host's
group, including each member's name, billing address, service address, account
number, meter number, and projected annual load;
(5) Certification that all members of the
group have executed an agreement with the host;
(6) A statement that all members and the host
are customers of the same distribution utility;
(7) The total historic annual load and the
total projected annual load of the host;
(8) The total historic annual load and the
total projected annual load of the members;
(9) The fuel source of the host's facility,
its generating capacity, the actual annual output of the host's facility, if
known, and the projected annual output of the facility;
(10) A statement that the total historic
annual load of the members together with the host exceeds the projected annual
output of the host's facility;
(11)
A statement that the host has provided a copy of the application to the
distribution utility;
(12) A
statement that the applicant has the authority to file the application on
behalf of the host and that the contents of the application are true, accurate,
and complete;
(13) Except as
allowed by Puc 902.16 and
Puc
902.22, a certification that none of the members is a
customer-generator;
(14) A
statement regarding whether the group is electing to receive on-bill monetary
credits;
(15) A statement regarding
whether the group has a low-moderate income community solar project;
(16) For groups that elect to receive on-bill
monetary credits:
a. The annual credit
percentage allocation for the host and each member; and
b. A statement verifying that the specified
percentage allocations meet the requirements of
Puc
909.12(e); and
(17) For hosts registering a group with a
low-moderate income community solar project:
a. Indication of residential end-user
customer status for the host and each member;
b. Indication whether the host and each
member is a residential end-user customer with household income at or below 300
percent of the federal poverty guidelines;
c. Specification of the amount of any group
host or member load attributable to non-residential end-user customers,
residential end-user customers, and affordable housing projects;
d. Description of the income verification
procedure for the group;
e.
Certification that the group meets the requirements of
Puc
909.13(d);
f. Certification that the agreement meets the
requirements of Puc
909.05(e);
g. Statement confirming that the specified
credit percentage allocations meet the requirements of
Puc
909.12(c) through (e) and
Puc
909.13(h);
h. Certification that no member is also a
member of another group at the time of registration;
i. Documentation demonstrating that any
member which is an affordable housing project qualifies as such under
Puc
902.01; and
j. Description of the direct, quantifiable
benefits to be provided by any member which is an affordable housing project to
the tenants or residents of that project pursuant to
Puc
909.13(e).
(b) The applicant shall sign and
date the document.
(c) The
individual signing the document shall certify that the information provided is
true, accurate, and complete, to the best of the individual's knowledge and
belief.
(d) For groups
participating in on-bill crediting, member information and credit percentage
allocations shall be provided in xls format.
(e) The applicant shall electronically file
the document and any attachments, in a format compatible with the computer
system of the commission, pursuant to
Puc
203.03, or through the following email address:
PUCGroupNetMetering@puc.nh.gov. The commission shall accept the document and
any attachments through the U.S. mail, by overnight express service, or by hand
delivery, if the applicant is unable to file the document
electronically.
Notes
#10502, INTERIM, eff 1-3-14, EXPIRES: 7-2-14
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.