N.H. Code Admin. R. Puc 511.03 - Inspection of Utilities

Current through Register Vol. 42, No. 14, April 7, 2022

(a) Inspections conducted pursuant to Puc 511.02 shall include a thorough review of the utility's records concerning inspection, operation, maintenance, and emergency procedures.
(b) Field inspections combined with office inspections shall cover:
(1) Operational checks of corrosion control provisions;
(2) Overpressure and regulating equipment;
(3) Odorization;
(4) Repaired leaks;
(5) Emergency valves;
(6) New construction;
(7) Maintenance of facilities;
(8) Selection of material and design of components;
(9) Qualifications and training of personnel;
(10) Public awareness programs, emergency response programs, quality assurance programs, underground damage prevention programs, and integrity management programs for transmission and distribution pipeline facilities;
(11) Control room management; and
(12) Any other components of the facility.

Notes

N.H. Code Admin. R. Puc 511.03

(See Revision Note at Chapter heading for Puc 500) #6445, eff 1-28-97; ss by #8259, eff 1-19-05; ss by #10334, eff 5-10-13

The following state regulations pages link to this page.



State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.