N.H. Code Admin. R. Puc 902.28 - Witness Test

"Witness Test" means the process used by the electric distribution utility following the interconnection of a customer-generator's facility to determine whether the interconnection affects the safety, reliability, or power quality of the utility's distribution system.

Notes

N.H. Code Admin. R. Puc 902.28
#10757, eff 1-8-15 (from Puc 902.19) ; Derived from Volume XL Number 33, Filed August 13, 2020, Proposed by #13080, Effective 9/14/2020, Expires 9/14/2030 (formerly Puc 902.28)

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.