Part Puc 905 - TECHNICAL REQUIREMENTS FOR INTERCONNECTION OF FACILITIES
- § Puc 905.01 - Requirements for Disconnect Switches
- § Puc 905.02 - Disconnect Switch
- § Puc 905.03 - Configuration of the Transformer Serving the Customer-Generator's Facility Site
- § Puc 905.04 - Initial Testing
- § Puc 905.05 - Periodic Testing
- § Puc 905.06 - Studies and Analysis
- § Puc 905.07 - Payment for Upgrades or Improvements to the Electric Distribution System