N.J. Admin. Code § 14:2-3.4 - Responsible contractors
(a) If rented
equipment, as defined at
N.J.A.C.
14:2-1.2, will be used for an excavation or
demolition, either the rented equipment operator or a responsible contractor
shall notify the One-Call center in accordance with
N.J.A.C.
14:2-3.1 and 3.2. The person who notifies the
One-Call center shall be responsible and liable for ensuring that all
excavation or demolition performed with rented equipment complies with this
chapter.
(b) Each responsible
contractor shall keep all logbooks and records required by this chapter for at
least seven years, and shall make them available to the Board or Board staff
upon request.
(c) A responsible
contractor that notifies the One-Call center under
N.J.A.C.
14:2-3.1 and 3.2 shall do all of the
following:
1. Provide information as required
by the One-Call center regarding all rented equipment that will be used in the
excavation or demolition;
2. Wait
the three business days required under
N.J.A.C.
14:2-3.1 prior to performing any excavation
or demolition on the site; and
3.
Notify the One-Call center of each rented equipment operator that performs
excavation or demolition on a site, specifying when the rented equipment
operator begins working on the site; and
4. Notify the One-Call center when each
rented equipment operator stops working on the site.
(d) At any time during the period that a
One-Call notice is valid under
N.J.A.C.
14:2-3.1(c), the responsible
contractor may add or remove one or more rented equipment operators to the
site, provided that the responsible contractor notifies the One-Call center
before each rented equipment operator performs any excavation or demolition. No
additional waiting period is required for the addition of a rented equipment
operator under this subsection.
(e)
A rented equipment operator shall contact the One-Call center directly to
verify that the responsible contractor has notified the One-Call center of the
rented equipment operator's participation in the excavation or demolition on
the site.
(f) A responsible
contractor shall not permit a rented equipment operator to perform excavation
or demolition on a site unless the responsible contractor has notified the
One-Call center that the responsible contractor will be working on that
particular site.
(g) If a
responsible contractor utilizes a rented equipment operator to perform
excavation or demolition, the responsible contractor shall do all of the
following:
1. Continuously visually monitor
all hand digging and locating required under this chapter; and
2. Inspect the excavation or demolition
performed by the rented equipment operator at least once each day during which
the rented operator is on the site.
(h) The responsible contractor shall maintain
all of the following records at the site, available for inspection by the Board
or Board staff, throughout the duration of the excavation or demolition:
1. A log, updated daily, of the time and
location of all hand-digging and locating performed by the rented equipment
operator; and
2. A list, updated
daily, of all rented equipment operators performing excavation or demolition on
the site and the date and time the One-Call Center was notified of the rented
equipment operator's work on the site.
Notes
See: 39 N.J.R. 1232(a), 39 N.J.R. 4422(b).