N.J. Admin. Code § 14:8-5.8 - Testing, maintenance and inspection after interconnection approval
(a) Once a net
metering interconnection has been approved under this subchapter, the EDC shall
not require a customer-generator to test or perform maintenance on its facility
except for the following:
1. An annual test in
which the customer-generator's facility is disconnected from the electric
distribution company's equipment to ensure that the facility stops delivering
power to the grid;
2. Any
manufacturer-recommended testing or maintenance; and
3. Any post-installation testing necessary to
ensure compliance with IEEE 1547 or to ensure safety.
(b) When a customer-generator facility
approved through a level 2 or level 3 review undergoes maintenance or testing
in accordance with the requirements of this subchapter, the customer-generator
shall retain written records documenting the maintenance and the results of
testing. No recordkeeping is required for maintenance or testing performed on a
customer-generator facility approved through a level 1 review.
(c) An EDC shall have the right to inspect a
customer-generator's facility after interconnection approval is granted, at
reasonable hours and with reasonable prior notice to the customer-generator. If
the EDC discovers that the customer-generator's facility is not in compliance
with the requirements of this subchapter, and the noncompliance adversely
affects the safety or reliability of the electric distribution system, the EDC
may require the customer-generator to disconnect the customer-generator
facility until compliance is achieved.
Notes
See: 41 N.J.R. 2215(a), 42 N.J.R. 78(a).
Added new (a); recodified former (a) through (e) as (b) through (f); in (b), updated the N.J.A.C. references, and substituted "interconnection equipment" for "equipment package"; and in (d)1, substituted the second occurrence of "facility" for "inverter". Former N.J.A.C. 14:8-5.8, Certification, recodified to N.J.A.C. 14:8-7.8.
Amended by R.2012 d.107, effective
See: 43 N.J.R. 1162(a), 44 N.J.R. 1703(a).
Section was "Requirements after approval of an interconnection". Deleted (a) through (c); and recodified (d) through (f) as (a) through (c).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.