N.J. Admin. Code § 6A:26-18.1 - Eligibility for section 15 grants for RODs, not including county vocational school districts
(a) Any ROD
applying for a section 15 grant shall conform at a minimum with the
requirements of this subchapter, as applicable.
(b) Any eligibility determination for a
section 15 grant shall be subject to the availability of funds.
(c) If the school facilities project or a
portion of it is eligible for State support, the ROD may request State debt
service aid pursuant to
18A:7G-9 in lieu of a section 15
grant.
(d) All of the following
conditions shall apply regarding eligibility for a section 15 grant:
1. A ROD shall have an approved LRFP,
pursuant to
6A:26-2.1(b).
2. The school facilities project has been
approved pursuant to
6A:26-3.3 and has no excess
costs.
3. The proposed school
facilities project shall fall within one or more of the priority project
categories described below.
i. Level 1 are
school facilities projects that address the most critical operational building
needs, including health and safety issues, and program mandates. The projects
shall consist of one or more of the following:
(1) Upgrades to essential building
systems;
(2) Repair or replacement
of a building skin element;
(3)
Fire or life safety building code issues;
(4) Upgrades consistent with the Americans
with Disabilities Act;
(5)
Hazardous materials abatement;
(6)
Security and communication systems;
(7) Site drainage to correct existing
conditions;
(8) Upgrades to
existing elementary school playgrounds as per
6A:26-3.2(a)5;
(9) Renovated or up to a maximum of six new
early childhood classrooms; or
(10)
Special population needs.
ii. Level 2 are school facilities projects
that address the rehabilitation of existing buildings, the easing of
overcrowding, and/or improving the quality of existing instructional spaces.
The projects shall consist of one or more of the following:
(1) Repair or replacement of existing
building systems and components not included in Level 1;
(2) Existing site upgrades excluding upgrades
to athletic fields or tracks; or
(3) Renovation or new construction of
capacity-generating classrooms to address overcrowding or a substandard
condition.
iii. Level 3
are school facilities projects that are either new construction or
rehabilitation that also qualifies as reconstruction. For purposes of this
subsection, "reconstruction" means reconstruction as defined in the UCC,
5:23-6.3. Reconstruction and/or new
construction projects shall be evaluated based upon the following attributes:
(1) Districtwide unhoused students and
overcrowding;
(2) Early childhood
program accommodations;
(3)
Compliance with facilities efficiency standards;
(4) Use of temporary or leased
facilities;
(5) Building
age;
(6) Project scope;
and
(7) Prior section 15
funding.
(e) If the school facilities project fits
into more than one of the priority project categories, the entire school
facilities project shall be deemed to fall within the lowest category for which
it qualifies.
(f) If a ROD submits
more than one application for a section 15 grant for a school facilities
project that includes new construction, all applications for section 15 grants
shall not have any excess costs to qualify for a section 15 grant.
(g) A ROD shall be eligible to receive a
section 15 grant for a school facilities project involving the replacement of a
building system that was all or part of a school facilities project that
previously received State support, provided the building system to be replaced
has approached or exceeded its life expectancy. The school district shall
provide documentation concerning the building system's life expectancy,
including, but not limited to, the original installation date or the building
system manufacturer's warranty.
(h)
A ROD may request on a Department-supplied form a preliminary ROD grant
eligibility determination for the scope of work of a school facilities
project.
(i) RODs may take one of
the following actions, as applicable, for a school facilities project that has
been submitted to the Department for approval or has received approval from the
Department prior to the deadline established pursuant to
6A:26-18.3(a):
1. A ROD that has submitted to the Office of
School Facilities an application for approval of a school facilities project
but has not yet received project approval may submit an application for a
section 15 grant pursuant to this subchapter in accordance with the grant
deadlines set forth in this subchapter.
2. If a ROD plans to submit an application
for a section 15 grant pursuant to this subchapter for a project that
previously was reviewed pursuant to
6A:26-3.1 2 as an "other capital"
project, the ROD shall withdraw from the Office of School Facilities the prior
application and resubmit a new one.
3. If a ROD plans to submit a school
facilities project for a section 15 grant pursuant to this subchapter for a
school facilities project that previously was approved for State debt service
aid and has accepted the preliminary eligible costs as the final eligible costs
prior to the deadline established pursuant to
6A:26-18.3(a),
the ROD shall withdraw from the Office of School Facilities the prior
application and resubmit a new one.
4. If a ROD plans to submit a school
facilities project for a section 15 grant pursuant to this subchapter for a
school facilities project that previously was approved for State debt service
aid but has not accepted the preliminary eligible costs as the final eligible
costs prior to the deadline established pursuant to
6A:26-18.3(a),
the ROD may request that the school facilities project be considered for a
section 15 grant instead of State debt service aid.
5. If a school facilities project is
cancelled pursuant to this subsection and an application for a section 15 grant
for the project is then submitted, the school facilities project must meet the
eligibility requirements and deadlines set forth in this subchapter.
6. Any submission by a ROD for a section 15
grant pursuant to this section shall include a resolution from the school board
of the district requesting the cancellation of the prior application and
submission of a new application for a section 15 grant for the specified school
facilities project.
(j)
A school facilities project or other capital project shall not be eligible for
a section 15 grant pursuant to this subchapter where:
1. A construction contract has been awarded
in connection with the school facilities project or other capital project;
or
2. The local share for the
school facilities project or other capital project has already been approved
pursuant to
6A:26-3.7.
Notes
See: 45 N.J.R. 1026(a), 45 N.J.R. 2557(a).
Section was "Eligibility for section 15 grants for RODS, not including county vocational school districts". Rewrote the section. Former N.J.A.C. 6A:26-18.1, Purpose, repealed.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.