N.J. Admin. Code § 7:10-10.6 - Inspection and testing requirements and procedures for physical connection installations
(a) Each physical connection installation
shall be inspected and tested as follows:
1.
A test for tightness under prevailing pressure conditions shall be conducted as
required pursuant to
N.J.A.C.
7:10-10.5(a) for an
application for an initial physical connection permit and at least once every
three months under an existing physical connection permit pursuant to
N.J.A.C.
7:10-10.5(b).
2. An internal inspection shall be conducted
within six months prior to the submission of an application for permit renewal
pursuant to
N.J.A.C.
7:10-10.5(b) and, after
reassembly, the owner of the facility shall test the backflow prevention device
for tightness to ensure the integrity of the device. An internal inspection
shall consist of the dismantling of a double check valve assembly or a reduced
pressure zone backflow preventer assembly to visually inspect the integrity of
the internal mechanism including the clappers, discs, and facing
rings.
3. The Department shall
approve a reduction in the frequency of the pressure tests conducted pursuant
to (a)1 above if the owner of the facility in which the physical connection
installation is located demonstrates to the Department that the facility is not
in operation during any time in a calendar quarter.
4. A reduced pressure zone backflow preventer
assembly shall not be subject to the internal inspection requirement of (a)2
above except for routine maintenance as specified by the manufacturer, or for
investigation of a malfunction, or as specifically required by the supplier of
water.
(b) The
inspection and testing required pursuant to (a) above shall be conducted either
by an authorized representative of the owner of the facility where the backflow
prevention device is installed in the presence of an authorized representative
of the administrative authority and/or the supplier of water, or by a certified
tester who holds a valid backflow prevention device tester certificate issued
by a certifying agency approved by the Department pursuant to
N.J.A.C.
7:10-10.8.
1. The owner of the facility may only select
certified testers from the most current list of certified testers supplied by
the certifying agency to the Department pursuant to
N.J.A.C.
7:10-10.8(f).
2. The administrative authority and/or the
supplier of water may require that an authorized representative of the
administrative authority or supplier of water be present to witness the
inspection and tests conducted by a certified tester.
3. If the tests and inspections are performed
by a certified tester, the owner of the facility shall mail copies of the
Quarterly Physical Connection Test and Maintenance Report to the administrative
authority and to the supplier of water within five days of conducting the tests
and inspections. The Quarterly Physical Connection Test and Maintenance Report
form may be obtained from the Department in accordance with
N.J.A.C.
7:10-2.6(a).
(c) Any test of a physical
connection installation conducted by an authorized representative of the
Department as part of an investigation or inspection pursuant to
N.J.A.C.
7:10-10.2 or any other provision of this
chapter shall not be considered as a substitute for the inspection and testing
required pursuant to (a) above.
(d)
The procedures for testing a double check valve assembly are as follows (see
Figure 1 in Appendix B):
1. Utilizing the
differential pressure gauge and not shutting off number 1 shut-off valve.
i. Step 1--Test number 1 check valve as
follows:
(1) Verify that the number 1
shut-off is open and number 2 shut-off valve is closed;
(2) Connect the high hose to test cock number
2;
(3) Connect the low hose to test
cock number 3;
(4) Open test cocks
2 and 3;
(5) Open high side bleed
needle valve on test kit bleeding the air from the high hose. Close the high
side bleed needle valve after high hose bleeding is completed;
(6) Open low side bleed needle valve on test
kit bleeding the air from the low hose. Close the low side bleed needle valve
after low hose bleeding completed;
(7) Record the differential gauge pressure
reading. It should be a minimum of 1 psi; and
(8) Shut off test cocks 2 and 3 and
disconnect the hoses.
ii. Step 2--Test number 2 check valve as
follows:
(1) Connect the high hose to test
cock number 3;
(2) Connect the low
hose to test cock number 4;
(3)
Open test cocks number 3 and 4;
(4)
Open high side bleed needle valve on test kit bleeding the air from the high
hose. Close the high side bleed needle valve after high hose bleeding is
completed;
(5) Open low side bleed
needle valve on test kit bleeding the air from the low hose. Close the low side
bleed needle valve after low hose bleeding is completed;
(6) Record the differential gauge pressure
reading. It should be a minimum of one psi; and
(7) Shut off test cocks 3 and 4 and
disconnect the hoses.
iii. Step 3--To check tightness of number 2
shut-off valve, both the number 1 and number 2 check valves shall be tight and
holding a minimum of one psi. Also, little or no fluctuation of inlet supply
pressure can be tolerated. The testing is performed as follows:
(1) Connect the high hose to test cock number
2;
(2) Connect the low hose to test
cock number 3;
(3) Open test cocks
numbers 2 and 3;
(4) Open high side
bleed needle valve on test kit bleeding the air from the high hose. Close the
high side bleed needle valve after bleeding of the high hose is
completed;
(5) Open low side bleed
needle valve on test kit bleeding the air from the low hose. Close the low side
bleed needle valve after bleeding of the low hose is completed;
(6) Record the differential gauge pressure
reading. It should be a minimum of one psi;
(7) Connect the bypass hose to test cock
number 4 and open test cock number 4;
(8) Open the high side control needle valve
and the bypass hose control needle valve on the test kit. (This supplies high
pressure water downstream of check valve number 2);
(9) Close test cock number 2. (This stops the
supply of high pressure water downstream of number 2 check valve). If the
differential pressure gauge holds steady, the number 2 shut-off valve may be
recorded as being tight. If the differential pressure gauge drops to zero, the
number 2 shut-off valve shall be recorded as leaking.
(A) With a leaking number 2 shut-off valve,
the device is, in most cases, in a flow condition, and the previous test
readings taken from Step 1 and Step 2 are invalid. Unless a non-flow condition
can be achieved, either through the operation of an additional shut-off
downstream, or the use of a temporary compensating by-pass hose, accurate test
results will not be achieved. The tester shall retest until valid results are
achieved.
iv.
This completes the standard field test for a double check valve assembly. Prior
to removal of the test equipment, the tester should ensure that the number 2
shut-off valve is opened, thereby reestablishing flow and the test kit drained
of water.
(e)
The procedures for testing a reduced pressure zone backflow preventer assembly
are as follows:
1. Install test equipment as
shown in Figure 2 in Appendix B.
i. Step
1--Test to ensure that the first check valve is tight and maintains a minimum
pressure of five psi differential pressure as follows:
(1) Verify that the number 1 shut-off valve
is open. Close the number 2 shut-off valve. If there is no drainage from the
relief valve, the first check can be assumed to be tight;
(2) Close all test kit valves;
(3) Connect the high pressure hose to test
cock number 2;
(4) Connect the low
pressure hose to test cock number 3;
(5) Open test cocks number 2 and number
3;
(6) Open high side bleed needle
valve on test kit bleeding the air from the high hose. Close the high side
bleed needle valve after the high hose bleeding is completed;
(7) Open the low side bleed needle valve on
test kit bleeding air from the low hose. Close the low side bleed needle valve
after the low hose bleeding is completed; and
(8) Record the differential gauge pressure.
It should be a minimum of five psi.
ii. Step 2--Test to ensure that the second
check valve is tight against backpressure as follows:
(1) Leaving the hoses hooked up as at the
conclusion of Step 1 in (e)1i above, connect the bypass hose to test cock
number 4;
(2) Open test cock number
4, the high control needle valve and the bypass hose control needle valve on
the test kit. This supplies high pressure water downstream of check valve
number 2. If the differential pressure gauge remains steady, and no water comes
out of the relief valve, the second check valve may be recorded as tight. If
the differential pressure gauge shows a drop in pressure and water comes out of
the relief valve, the second check shall be recorded as leaking;
(3) To check the tightness of the number 2
shut-off valve, leave the hoses hooked up the same as at the conclusion of Step
2 above, and then close test cock number 2. This stops the supply of any high
pressure water downstream of check valve number 2. If the differential pressure
gauge reading holds steady, the number 2 shut-off valve may be recorded as
being tight. If the differential pressure gauge drops to zero, the number 2
shut-off valve shall be recorded as leaking;
(A) With a leaking number 2 shut-off valve,
the device is, in most cases, in a flow condition and the previous readings
taken from Step 1 and Step 2 are invalid. Unless a non-flow condition can be
achieved, either through the operation of an additional shut-off downstream, or
the use of a compensating temporary bypass hose, (see Figure 2A, Appendix B)
accurate test results will not be achieved. The tester shall retest until valid
results are achieved.
iii. Step 3--Check that the relief valve
opens at a minimum pressure of two psi below inlet pressure, as follows:
(1) With the hoses hooked up the same as at
the conclusion of Step 2 in (e)1ii above, slowly open up the low control needle
valve on the test kit and record the differential pressure gauge reading at the
point when the water initially starts to drip from the relief valve opening.
This pressure reading should not be below two psi.
iv. This completes the standard field test
for a reduced pressure zone backflow preventer assembly. Prior to removal of
the test equipment, the tester should ensure that the number 2 shut-off valve
is opened, thereby reestablishing flow and test kit drained of water.
(f) The results of the
pressure tests conducted pursuant to (d) and (e) above shall be recorded on the
Quarterly Physical Connection Test and Maintenance Report form submitted with
either the initial or renewal application form as specified at
N.J.A.C.
7:10-10.5(a) or (b) as
appropriate.
1. The Quarterly Physical
Connection Test and Maintenance Report form is available from the Department
and includes the following information:
i. The
date of pressure test and inspection;
ii. The physical connection permit
number;
iii. The make, type, size,
model, and serial number of the backflow prevention device;
iv. The facility name and address;
v. Pressure test and internal inspection
results; and
vi. A certification of
the certified tester (if applicable), administrative authority and supplier of
water.
(g)
The owner of a facility shall repair and retest within 30 days any approved
physical connection installation which fails a pressure test and/or an internal
inspection. If repairs are not possible and a new physical connection is
required, the facility owner shall secure approval from the Department of the
new backflow prevention device as specified in
N.J.A.C.
7:10-10.7.
(h) Any test kit utilized to conduct the
tests pursuant to this section shall be calibrated in accordance with the
recommendations of the test kit manufacturer.