N.M. Admin. Code § 14.7.2.23 - CHAPTER 15 - ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
See this chapter except as provided below:
A.
Section 1503 - Weather
Protection. See this section of the IBC except as provided below.
(1)
Section 1503.3 - Parapet
walls. Delete this section and replace with the following: Parapet walls
shall be coped or covered in accordance with Sections 1503.3.1. 1503.3.2, and
1503.3.3. The top surface of the parapet wall shall provide positive
drainage.
(2) Add the following new
section: 1503.3.3 - Plastered Parapets. Plastered
parapets shall require a seamless but permeable waterproof cover or weather
barrier, capping the entire parapet and wrapping over each side. The cover
shall extend past any break from the vertical a minimum of four inches on the
wall side. On the roof side, the cover shall properly lap any rising roof felts
or membranes and be properly sealed. A layer of expanded metal lath shall be
installed over the cover before plaster or stucco is applied. The lath shall
extend past any break from the vertical on the wall side a minimum of five
inches and on the roof side, the same distance as the cover below, allowing for
plaster stops or seals. No penetrating fasteners are allowed on the horizontal
surface of parapets.
B.
Section 1506 - Materials. See this section of the IBC and add the
following new sections.
(1)
Section
1506.4 - Loose granular fill. Pumice and other granular fill type
materials are not permitted in roofing assemblies.
(2)
Section 1506.5 - Roof deck
transitions. Where roof sheathing is overlapped to create "crickets" or
valleys to canals, taperboard or equivalent shall be used to transition between
the two deck levels to create a uniform substrate.
(3)
Section 1506.6 - Canales or
scuppers. All canales and scuppers must have a metal pan lining
extending not less than six inches (152 mm) past the inside of the parapet and
not less than six inches (152 mm) from each side of the canale or scupper
opening. All canales and scuppers must have positive
drainage.
C.
Section 1512 - Reroofing. See this section of the IBC except as
provided below. Section 1512.3 - Roof recovering. See this section
of the IBC and add the following sentence to the end: New roof coverings shall
not be installed without first removing existing roof coverings down to the
structural roof deck. Where pumice or other granular fill are present, the
material must be removed prior to installing new roof.