N.M. Admin. Code § 20.6.2.5005 - PRE-CLOSURE NOTIFICATION AND CLOSURE REQUIREMENTS
A. Any person proposing to close a Class I,
III, IV or V underground injection controlwell must submit pre-closure
notification to the department at least 30 days prior to closure. Pre-closure
notification must include the following information:
(1) Name of facility.
(2) Address of facility.
(3) Name of Owner/Operator.
(4) Address of Owner/Operator.
(5) Contact Person .
(6) Phone Number.
(7) Type of Well (s).
(8) Number of Well (s).
(9) Well Construction (e.g. drywell , improved
sinkhole , septic tank, leachfield, cesspool, other...).
(10) Type of Discharge.
(11) Average Flow (gallons per
day).
(12) Year of Well
Construction.
(13) Proposed Well
Closure Activities (e.g. sample fluids/sediment, appropriate disposal of
remaining fluids/sediments, remove well and any contaminated soil, clean out
well , install permanent plug, conversion to other type well , ground water and
vadose zone investigation, other).
(14) Proposed Date of Well Closure.
(15) Name of Preparer.
(16) Date.
B. Proposed well closure activities must be
approved by the department prior to implementation.