Part 568 - INTERCONNECTION OF GENERATING FACILITIES WITH A NAMEPLATE RATING UP TO AND INCLUDING 10 MW CONNECTING TO A UTILITY SYSTEM

  1. § 17.9.568.1 - ISSUING AGENCY
  2. § 17.9.568.2 - SCOPE
  3. § 17.9.568.3 - STATUTORY AUTHORITY
  4. § 17.9.568.4 - DURATION
  5. § 17.9.568.5 - EFFECTIVE DATE
  6. § 17.9.568.6 - OBJECTIVE
  7. § 17.9.568.7 - DEFINITIONS
  8. § 17.9.568.8 - APPLICABILITY
  9. § 17.9.568.9 - LIBERAL CONSTRUCTION
  10. § 17.9.568.10 - APPLICABLE CODES AND STANDARDS
  11. § 17.9.568.11 - IEEE 1547-2018 ADOPTION
  12. § 17.9.568.12 - DETERMINATION OF EXPORT CAPACITY STATUS
  13. § 17.9.568.13 - APPLICATION REVIEW PROCESS
  14. § 17.9.568.14 - OPTIONAL PRE-APPLICATION REPORT
  15. § 17.9.568.15 - SIMPLIFIED PROCESS
  16. § 17.9.568.16 - FAST TRACK PROCESS
  17. § 17.9.568.17 - SUPPLEMENTAL REVIEW
  18. § 17.9.568.18 - DETAILED STUDY PROCESS
  19. § 17.9.568.19 - COST SHARING FOR INTERCONNECTION UPGRADES
  20. § 17.9.568.20 - INTERCONNECTION AGREEMENT
  21. § 17.9.568.21 - PERMISSION TO OPERATE
  22. § 17.9.568.22 - INTERCONNECTION APPLICATION REVIEW FLOW CHART: [RESERVED]
  23. § 17.9.568.23 - GENERAL PROVISIONS APPLICABLE TO INTERCONNECTION APPLICATIONS
  24. § 17.9.568.24 - GENERAL PROVISIONS APPLICABLE TO UTILITIES
  25. § 17.9.568.25 - GENERAL PROVISIONS APPLICABLE TO INTERCONNECTION CUSTOMERS
  26. § 17.9.568.26 - EXTENSIONS
  27. § 17.9.568.27 - DISPUTE RESOLUTION
  28. § 17.9.568.28 - REPORTING REQUIREMENTS
  29. § 17.9.568.29 - SAFETY PROVISIONS
  30. § 17.9.568.30 - VARIANCES
  31. Appendix 1A - Simplified Interconnection Application Certified Inverter-Based Generating Facilities With an Export Capacity up to and including 25 kW AC and a Nameplate Rating not exceeding 50 kW
  32. Appendix 1B - Standard Interconnection Application
  33. Appendix 1C - Interconnection Agreement

Notes

HISTORY OF 17.9.568 NMAC:
Pre-NMAC History: None.
History of Repealed Material:
17.9.568 NMAC, Interconnection of Generating Facilities with a Rated Capacity up to and Including 10 MW Connecting to a Utility System (filed 10/15/2008) repealed effective 2/14/2023.
Other History:
17.9.568 NMAC, Interconnection of Generating Facilities with a Rated Capacity up to and Including 10 MW Connecting to a Utility System (filed 10/15/2008) was replaced by 17.9.568 NMAC, Interconnection of Generating Facilities with a Rated Capacity up to and Including 10 MW Connecting to a Utility System, effective 2/14/2023.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.