N.Y. Comp. Codes R. & Regs. Tit. 12 §§ 23-4.2 - Trench and area type excavations
(a)
Whenever any person is required to work in or is lawfully frequenting any
trench or excavation five feet or more in depth which has sides or banks with
slopes steeper than those permitted in Table I of this Subpart, such sides or
banks shall be provided with sheeting and shoring in compliance with this Part
(rule). Such sheeting and shoring system shall be in contact with the sides or
banks of such trench or excavation. A designated person shall carefully inspect
such sheeting and shoring at least once each day and more frequently in the
event of rain, the presence of additional surface or ground water from any
source, excessive ground vibrations or whenever additional loads of any kind
have been imposed near or adjacent to such excavation. Additional protection
against slides and cave-ins shall be provided whenever necessary. Any trench or
excavation in clay, sand, silt, loam or nonhomogenous soil which has sides or
banks more than three feet but less than five feet in depth shall be provided
with side or bank protection in compliance with this Part (rule). Such side or
bank protection shall not be required where an employer maintains on file at
the excavation site a dated certification in writing by a designated person who
is qualified by training and experience indicating that such person has
examined the sides and banks and has found them to be stable and not subject to
failure or cave-in. Such certification shall be available for examination by
the commissioner.
(b) Where the
sides or banks of a trench or area type excavation may be sloped back without
causing subsidence or damage to buildings, structures, utilities, roads,
streets, highways or similar facilities, sloping of the excavation sides or
banks may be used as protection in lieu of the sheeting and shoring required by
this Part (rule), provided such sloping conforms to the values set forth in
Table I of this Subpart. Such sloping of the excavation sides or banks may be
used in combination with sheeting and shoring. When such a combination is used,
a level bench at least 24 inches in width shall be left between the toe of the
sloped section and the braced section. The sheeting of the braced section shall
extend at least 12 inches above the elevation of such level bench.
(c) Any unbraced sloped excavation which
extends below the ground water table, especially adjacent to rivers, reservoirs
or other bodies or sources of free water, shall be under the direct supervision
of an experienced person designated by the employer.
(d) In any excavation with a combination of
sloped unbraced sides or banks near the surface and vertical sheeted and shored
sides or banks near the bottom, the steepest allowable slope of such unbraced
portion of the sides or banks shall be based on the total excavation depth.
(See Table I of this Subpart.)
(e)
Where any side or bank of an excavation is undercut and has a reverse slope
toward the trench centerline creating a vertical load on the sheeting and
shoring, such sheeting and shoring shall be designed by, and installed in
accordance with the specifications determined by, a professional engineer
licensed to practice in the State of New York. Such sheeting and shoring shall
be designed to support the vertical load imposed by the overhanging material as
well as the load imposed by the adjacent ground.
(f) Excavated material and other superimposed
loads shall be placed at least 24 inches back from the edges of any open
excavation and shall be so placed or piled that no part thereof can slide, fall
or roll into the excavation. Such 24-inch required clearance may be reduced if
the employer installs a barrier or similar retaining device which is designed
and constructed to prevent excavated material from falling into the excavation.
TABLE I
STEEPEST ALLOWABLE UNBRACED SLOPES
| Depth of Excavation | ||
| Type of Soil or Rock | 5 to 10 ft. | Over 10 ft. |
| Stiff cohesive soil | 11/2 vertical on 1 horizontal | 1 vertical on 1 horizontal (trench) 1 1/2 vertical on 1 horizontal (area) |
| Noncohesive soil | 1 vertical on 1 horizontal 1 vertical on 1 1/2 horizontal (when subject to vibrations) | 1 vertical on 1 horizontal 1 vertical on 1 1/2 horizontal (when subject to vibrations) |
| Soft cohesive or wet flowing soil | 1 vertical on 1 horizontal 1 vertical on 11/2 horizontal (when subject to vibrations) | 1 vertical on 11/2 horizontal (trench) 1 vertical on 1 horizontal (area) 1 vertical on 1 1/2 horizontal (when subject to vibrations) |
| Stable rock | Vertical sides permitted | Vertical sides permitted |
| Unstable rock | 11/2 vertical on 1 horizontal | 11/2 vertical on 1 horizontal |
Notes: The slopes given in Table I are the steepest allowable. Conditions may occur requiring the use of flatter slopes to prevent slope failure and subsidence of adjacent areas. A slope shall start from the bottom of each side of an excavation or where the lower portions of such sides consist of stable rock from the top of such rock.
(g) All sides or banks, slopes and
areas in and adjacent to any excavation shall be stripped and cleared of loose
rock or any other material which may slide, fall, roll or be pushed upon any
person located in such excavation.
(h) Any open excavation adjacent to a
sidewalk, street, highway or other area lawfully frequented by any person shall
be effectively guarded. Such guarding shall consist of a substantial fence or
barricade. As an alternative, such guarding may consist of an extension of the
sheeting above the ground surface adjacent to the excavation to a height of at
least 42 inches above such adjacent street, highway or other area lawfully
frequented by any person. In lieu of such guarding, protection may be afforded
by a substantial covering installed over such excavation. Such covering shall
consist of planking at least two inches thick full size, properly supported
exterior grade plywood at least three-quarters inch thick or material of
equivalent strength. Where it is possible that the movement of vehicles or
other heavy equipment will take place over such covering, the covering shall be
of sufficient strength to withstand such loading without structural failure of
the covering or of the support system.
(i) Where no work is being performed in an
unattended open excavation which has substantially vertical sides or banks
three feet or more in depth, such excavation shall be effectively guarded on
all open sides regardless of the location of such excavation. Such guarding
shall consist of a fence, a barricade or a safety railing constructed and
installed in compliance with this Part (rule). As an alternative, such guarding
may consist of an extension of the sheeting above the excavation to a height of
at least 42 inches above the adjacent ground, grade or equivalent level. In
lieu of such guarding, protection may be afforded by a substantial covering
installed over the excavation. Such covering shall consist of planking at least
two inches thick full size, properly supported exterior grade plywood at least
three-quarters inch thick or material of equivalent strength. Where it is
possible that the movement of vehicles or other heavy equipment will take place
over such covering, the covering shall be of sufficient strength to withstand
such loading without structural failure of the covering or of the support
system.
(j) Temporary sheet piling
installed in an excavation to permit the construction of a retaining or
structural wall shall be left in place until such wall has developed adequate
strength to support any load intended to be imposed upon such wall.
(k) Persons shall not be suffered or
permitted to work in any area where they may be struck or endangered by any
excavation equipment or by any material being dislodged by or falling from such
equipment.
(l) The sides of any
excavation in stable rock may be vertical and are not required to be provided
with sheeting and shoring. Such sides shall be scaled and kept free of all
loose rock or material that may be dislodged or may fall into such
excavation.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.