N.Y. Comp. Codes R. & Regs. Tit. 12 §§ 56-8.2 - Access to and maintenance of decontamination systems and regulated abatement work area enclosures
(a)
Access. Entry to the personal and waste decontamination system enclosures shall
be restricted to the asbestos contractors involved with the asbestos project,
appropriately certified employees of the asbestos contractors, authorized
visitors, police, fire and other public safety personnel.
(b) Waiting periods. Prior to beginning Phase
II B asbestos abatement work and upon completion of the construction of all
small and large size regulated abatement work area enclosures and
decontamination system enclosures, including establishment of the negative air
system, a four hour waiting period with negative air units operating shall be
required to insure that all barriers shall remain intact and secured to the
walls, ceilings, floors and fixtures.
(c) Waiting period exemption. The four hour
waiting period may be eliminated for exterior work where negative air is not
required.
(d) Inspection of
barriers. All barriers shall be inspected by the asbestos supervisor at least
twice daily, before the start of and following the completion of the day's
abatement activities. Inspections are also required on days when there is no
Phase II work or support activities scheduled. Inspections and observations
shall be documented by the asbestos abatement contractor's supervisor in a
daily project log.
(e) Repairs to
barriers and enclosures. Damage and defects in the barriers and enclosures
shall be repaired immediately upon discovery and shall be documented by the
asbestos abatement contractor's supervisor in a daily project log, prior to
resumption of abatement activities.
(f) Testing of barriers and enclosures. Smoke
tube testing to ensure the effectiveness of all isolation barriers, personal
decontamination system enclosures, waste decontamination system enclosures and
regulated abatement work area enclosures shall be performed prior to the
beginning of abatement activities and at least once a day thereafter until
satisfactory clearance air sampling results have been obtained. Negative air
pressure ventilation units shall be in operation during this testing. Testing
of barriers and enclosures is not required on days when there are no Phase II B
or cleaning activities scheduled. Test results, observations and any
modifications shall be documented by the asbestos abatement contractor's
supervisor in a daily project log.
(g) Loss of enclosure integrity. If visible
emissions or water leaks are observed outside of the regulated abatement work
area, or if a glovebag, tent or enclosure of any type fails or loses its
integrity, work shall be stopped and the following procedures shall be
followed:
(1) Isolation and critical barrier
construction. Isolation and critical barriers shall be constructed as follows:
(i) Isolate HVAC systems. The HVAC systems
shall be shut down immediately and all openings shall be sealed with at least
six mil fire-retardant plastic sheeting and duct tape.
(ii) Isolate uncontaminated areas.
Passageways to uncontaminated areas of the building or structure shall be
sealed with at least six mil fire-retardant plastic sheeting and duct
tape.
(iii) Install critical
barriers. Critical barriers within 25 feet of the regulated abatement work area
shall be installed as per section
56-7.11 of this Part.
(2) Negative air pressure
equipment ventilation. Negative air pressure equipment ventilation that
complies with section
56-7.8 of this Part shall be
installed and utilized.
(3)
Cleanup. Cleanup shall be accomplished as follows:
(i) Method, tools and equipment. All
accumulations of asbestos waste material shall be containerized and removed.
Non-metal shovels and HEPA-vacuums may be used to pick up or move waste except
in the vicinity of isolation barriers which might be breached. The areas around
isolation barriers shall be cleaned utilizing rubber or plastic dustpans,
squeegees or shovels. HEPA-vacuums shall be used to clean all surfaces after
gross cleanup.
(ii) Cleanup of
surfaces. All surfaces in the regulated abatement work area shall be
wet-cleaned using rags, mops and sponges.
(iii) Second cleaning. After the first
cleaning, at least 12 hours shall be allowed for asbestos to settle.
Thereafter, all objects and surfaces in the regulated abatement work area shall
be HEPA-vacuumed and wet-cleaned. All windows, doors, HVAC system vents and all
other openings shall remain sealed.
(4) Removal of contaminated equipment and
waste. All remaining contaminated equipment and containerized waste shall be
removed from the regulated abatement work area.
(5) Clearance air sampling. Clearance air
sampling shall be conducted, as per the schedule for air sampling and
analysis.
(6) Isolation barrier
removal. Isolation barriers shall be removed only after satisfactory clearance
air sampling results have been achieved.
(h) Daily cleaning of enclosures. The
asbestos abatement contractor shall HEPA-vacuum or wet-clean the waste
decontamination system enclosures, the personal decontamination system
enclosures, and airlocks when remote decontamination units are used, daily
during Phase II A through C abatement activities. This cleaning shall take
place at the end of each work shift and the asbestos abatement contractor's
supervisor shall document it in the daily project log.