N.Y. Comp. Codes R. & Regs. Tit. 12 §§ 56-8.8 - Asbestos material encasement/enclosure procedures
The encasement/enclosure of existing ACM, PACM or asbestos material shall be conducted in accordance with the following:
(a) Regulated abatement work area
preparation. The regulated abatement work area shall be pre-cleaned, isolated
and negative air established in accordance with Subpart 56-7 of this
Part.
(b) Use of amended water.
Areas that may be disturbed during the installation of hangers or other support
and framing materials for the enclosure shall be sprayed with amended water.
These areas shall be kept damp to reduce airborne asbestos
concentrations.
(c) Loose and
hanging asbestos material. Loose or hanging ACM, PACM or asbestos material
shall be removed in accordance with the requirements of section
56-8.4 of this Subpart.
(d) Repair of fireproofing and thermal
insulation. After installation of hangers, brackets or other
encasement/enclosure supports, and before installation of encasement/enclosure
sheathing material, damaged areas of fireproofing and thermal insulation shall
be repaired using a non-asbestos material as per section
56-7.2 of this Part. Surfaces
shall be prepared and replacement material applied in accordance with
manufacturer's recommendation.
(e)
Integrity of installation. Encasements/enclosures shall be designed to be
permanent and shall be constructed to provide an airtight barrier. The
encasement/enclosure sheathing material shall be impact resistant and shall be
installed with adequate supports, reinforced to withstand local environmental
conditions, casual contact and any internal pressures developed within the
encasement/enclosure structure.
(f)
Utility maintenance. Utilities shall be lowered as necessary and reinstalled in
a manner which allows proper utilization, and does not disturb the integrity of
the encasements/enclosures. Utility maintenance shall not require the
encasements/enclosures to be opened or disturbed.
(g) Ducts. Ducts insulated with ACM, PACM or
asbestos material shall not be encased or enclosed.
(h) Air plenums. ACM, PACM or asbestos
material-insulated air plenums, which are not readily accessible for
inspection, shall not be encased or enclosed.
(i) Marking or labeling. Encased/enclosed
asbestos material shall be conspicuously marked or labeled in order to warn
persons of its presence.
(j)
Cleanup. Waste cleanup shall be in accordance with section
56-8.5 of this Subpart.
(k) Final cleaning and clearance air
sampling. Final cleaning and clearance air sampling shall be in accordance with
Subpart 56-9 of this Part.