The owners and operators, and to the extent applicable,
the CO2 authorized account representative of a
CO2 budget unit, shall comply with the monitoring,
recordkeeping and reporting requirements as provided in this Subpart and all
applicable sections of 40 CFR part 75 (see Table 1, section
200.9 of this Title). Where
referenced in the Subpart, the monitoring requirements of 40 CFR part 75 (see
Table 1, section
200.9 of this Title) shall be
adhered to in a manner consistent with the purpose of monitoring and reporting
CO2 mass emissions pursuant to this Subpart. For
purposes of complying with such requirements, the definitions in section
242-1.2 of this Part and in
40
CFR 72.2 (see Table 1, section 200.9 of this
Title) shall apply, and the terms ''affected unit,'' ''designated
representative,'' and ''continuous emissions monitoring system'' (or ''CEMS'')
in 40 CFR part 75 (see Table 1, section 200.9 of this Title) shall be replaced
by the terms ''CO2 budget unit,''
''CO2 authorized account representative,'' and
''continuous emissions monitoring system'' (or ''CEMS''), respectively, as
defined in section
242-1.2 of this Part. For units not
subject to an acid rain emissions limitation, the term "Administrator' in 40
CFR part 75 (see Table 1, section 200.9 of this Title) shall be replaced with
"the department or its agent." Owners or operators of a
CO2 budget unit who monitor a
non-CO2 budget unit pursuant to the common, multiple, or
bypass stack procedures in
40
CFR 75.72(b)(2)(ii), or
40 CFR
75.16(b)(2)(ii)(B) as
pursuant to
40 CFR
75.13 (see Table 1, section 200.9 of this
Title), for purposes of complying with this Part, shall monitor and report
CO2 mass emissions from such
non-CO2 budget unit according to the procedures for
CO2 budget units established in sections
242-8.1 through
242-8.7 of this Subpart.
(a) 'Requirements for installation,
certification, and data accounting'. The owner or operator of each
CO
2 budget unit must meet the following requirements.
(1) Install all monitoring systems necessary
to monitor CO
2 mass emissions in accordance with 40 CFR
part
75 (see Table 1, section
200.9 of this Title), except for
equation G1. Equation G1 in Appendix G shall not be used to determine
CO
2 emissions under this Part. This may require systems
to monitor CO
2 concentration, stack gas flow rate,
O
2 concentration, heat input, and fuel flow
rate.
(2) Successfully complete all
certification tests required under section
242-8.2 of this Subpart and meet
all other requirements of this Subpart and 40 CFR part
75 (see Table 1, section
200.9 of this Title) applicable to
the monitoring systems under paragraph (1) of this subdivision.
(3) Record, report and quality-assure the
data from the monitoring systems under paragraph (1) of this
subdivision.
(b)
'Compliance dates' The owner or operator shall meet the monitoring system
certification and other requirements of paragraphs (a)(1) through (3) of this
section on or before the following dates. The owner or operator shall record,
report and quality-assure the data from the monitoring systems under paragraph
(a)(1) of this section on and after the following dates.
(1) The owner or operator of a
CO2 budget unit, except for a CO2
budget unit under paragraph (3) of this subdivision, that commenced commercial
operation before July 1, 2008, must comply with the requirements of this
Subpart by January 1, 2009.
(2) The
owner or operator of a CO budget unit subject to the applicability provisions
in paragraph 242-1.4(a)(2) of this Part, except for a CO budget unit under
paragraph (3) of this subdivision, that commenced commercial operation before
July 1, 2019, must comply with the requirements of this Subpart by January 1,
2021.
(3) The owner or operator of
a CO
2 budget unit that commences commercial operation on
or after July 1, 2019 must comply with the requirements of this Subpart by the
later of the following dates:
(i) January 1,
2020; or
(ii) the earlier of:
(a) 90 unit operating days after the date on
which the unit commences commercial operation; or
(b) 180 calendar days after the date on which
the unit commences commercial operation.
(4) For the owner or operator of a
CO
2 budget unit for which construction of a new stack or
flue installation is completed after the applicable deadline under paragraph
(1) or (2) of this subdivision by the earlier of:
(i) 90 unit operating days after the date on
which emissions first exit to the atmosphere through the new stack or flue;
or
(ii) 180 calendar days after the
date on which emissions first exit to the atmosphere through the new stack or
flue.
(c)
'Reporting data'.
(1) Except as provided in
paragraph (2) of this subdivision, the owner or operator of a
CO
2 budget unit that does not meet the applicable
compliance date set forth in paragraphs (b)(1), (2) and (3) of this section for
any monitoring system under paragraph (a)(1) of this section shall, for each
such monitoring system, determine, record, and report maximum potential (or as
appropriate minimum potential) values for CO
2
concentration, CO
2 emissions rate, stack gas moisture
content, fuel flow rate, heat input and any other parameter required to
determine CO
2 mass emissions in accordance with
40 CFR
75.31(b)(2)
or (c)(3), or section 2.4 of Appendix D of 40
CFR part
75 (see Table 1, section 200.9 of this Title) as applicable.
(2) The owner or operator of a
CO
2 budget unit that does not meet the applicable
compliance date set forth in paragraph (b)(3) of this section for any
monitoring system under paragraph (a)(1) of this section shall, for each such
monitoring system, determine, record, and report substitute data using the
applicable missing data procedures in Subpart D or appendix D of 40 CFR part
75
(see Table 1, section 200.9 of this Title), in lieu of the maximum potential
(or as appropriate minimum potential) values for a parameter if the owner or
operator demonstrates that there is continuity between the data streams for
that parameter before and after the construction or installation under
paragraph (b)(3) of this section.
(3) Low Mass Emissions Methodologies (LME).
(i) CO
2 budget units
subject to an acid rain emissions limitation or Parts 243, 244 and 245 of this
Title that qualify for the optional SO
2,
NO
x, and CO
2 (for acid rain) or
NO
x (for Parts 243, 244 and 245 of this Title) emissions
calculations for LME units under
40
CFR
75.19 (see Table 1, section 200.9 of this
Title) and report emissions for such programs using the calculations under
40
CFR
75.19 (see Table 1, section 200.9 of this
Title), shall also use the CO
2 emissions calculations
for LME units under
40
CFR
75.19 (see Table 1, section 200.9 of this
Title) for purposes of compliance with this Subpart.
(ii) CO
2 budget units
subject to an acid rain emissions limitation or Parts 243, 244 and 245 of this
Title that do not qualify for the optional SO
2,
NO
x, and CO
2 (for acid rain) or
NO
x (for Parts 243, 244 and 245 of this Title) emissions
calculations for LME units under
40
CFR
75.19 (see Table 1, section 200.9 of this
Title), shall not use the CO
2 emissions calculations for
LME units under
40
CFR
75.19 (see Table 1, section 200.9 of this
Title) for purposes of compliance with this Subpart.
(iii) CO
2 budget units
not subject to an acid rain emissions limitation or Parts 243, 244 and 245 of
this Title shall qualify for the optional CO
2 emissions
calculation for LME units under
40
CFR
75.19 (see Table 1, section 200.9 of this
Title), provided that they emit less than 100 tons of
NO
x annually and no more than 25 tons of
SO
2 annually.
(d) 'Prohibitions'.
(1) No owner or operator of a
CO
2 budget unit shall use any alternative monitoring
system, alternative reference method, or any other alternative for the required
continuous emissions monitoring system without having obtained prior written
approval in accordance with section
242-8.6 of this Subpart.
(2) No owner or operator of a
CO
2 budget unit shall operate the unit so as to
discharge, or allow to be discharged, CO
2 emissions to
the atmosphere without accounting for all such emissions in accordance with the
applicable provisions of this Subpart and 40 CFR part
75 (see Table 1, section
200.9 of this Title).
(3) No owner
or operator of a CO
2 budget unit shall disrupt the
continuous emissions monitoring system, any portion thereof, or any other
approved emissions monitoring method, and thereby avoid monitoring and
recording CO
2 mass emissions discharged into the
atmosphere, except for periods of recertification or periods when calibration,
quality assurance testing, or maintenance is performed in accordance with the
applicable provisions of this Subpart and 40 CFR part
75 (see Table 1, section
200.9 of this Title).
(4) No owner
or operator of a CO
2 budget unit shall retire or
permanently discontinue use of the continuous emissions monitoring system, any
component thereof, or any other approved emissions monitoring system under this
Subpart, except under any one of the following circumstances:
(i) The owner or operator is monitoring
emissions from the unit with another certified monitoring system approved, in
accordance with the applicable provisions of this Subpart and 40 CFR part
75
(see Table 1, section 200.9 of this Title), by the department for use at that
unit that provides emissions data for the same pollutant or parameter as the
retired or discontinued monitoring system; or
(ii) The CO2
authorized account representative submits notification of the date of
certification testing of a replacement monitoring system in accordance with
subparagraph 242-8.2(d)(3)(i) of this Subpart.