N.Y. Comp. Codes R. & Regs. Tit. 8 § 155.5 - Uniform safety standards for school construction and maintenance projects
(a) Monitoring of
construction and maintenance activities. The occupied portion of any school
building shall always comply with the minimum requirements necessary to
maintain a certificate of occupancy and shall be monitored during construction
or maintenance activities for safety violations by school district personnel.
It is the responsibility of the board of education or board of cooperative
educational services to assure that these standards are continuously maintained
when the building or any portion thereof is occupied.
(b) Investigation and disposition of
complaints relating to health and safety received as a result of construction
and maintenance activities. Boards of education and boards of cooperative
educational services shall follow procedures established under section
155.4(d)(7) of
this Part.
(c) Pre-construction
testing and planning for construction projects.
(1) Boards of education and boards of
cooperative educational services shall assure that proper planning is made for
safety of building occupants during construction. For all construction projects
for which bids are issued on or after September 30, 1999, such boards shall
assure that safety is addressed in the bid specifications and contract
documents before contract documents are advertised for bid. All school areas to
be disturbed during renovation or demolition shall be tested for lead and
asbestos. Appropriate procedures to protect the health of building occupants
shall be included in the final construction documents for bidding.
(2) Boards of education and boards of
cooperative educational services shall establish procedures for involvement of
the health and safety committee to monitor safety during school construction
projects. The health and safety committees in school districts other than in
cities with one million inhabitants or more shall be expanded during
construction projects to include the project architect, construction manager,
and the contractors. Such committee shall meet periodically to review issues
and address complaints related to health and safety resulting from the
construction project. In the case of a city school district in a city of one
million inhabitants or more, the board of education shall submit procedures for
protecting health and safety during construction to the commissioner for
approval. Such procedures shall outline methods for compliance with this
section.
(3) The district emergency
management plan shall be updated to reflect any changes necessary to
accommodate the construction process, including an updated emergency exit plan
indicating temporary exits required due to construction. Provisions shall be
made for the emergency evacuation and relocation or release of students and
staff in the event of a construction incident.
(4) Fire drills shall be held to familiarize
students and staff with temporary exits and revised emergency procedures
whenever such temporary exits and revised emergency procedures are
required.
(d)
Pre-construction notification of construction projects. The board of education
or board of cooperative educational services shall establish procedures for
notification of parents, staff and the community in advance of a construction
project of $10,000 or more to be conducted in a school building while the
building is occupied. Such procedures shall provide notice at least two months
prior to the date on which construction is scheduled to begin, provided that in
the case of emergency construction projects, such notice shall be provided as
far in advance of the start of construction as is practicable. Such notice
shall include information on the district's obligations under this section to
provide a safe school environment during construction projects. Such notice
requirement may be met by publication in district newsletters, direct mailings,
or holding a public hearing on the project to inform parents, students, school
personnel and community members.
(e) General safety and security standards for
construction projects.
(1) All construction
materials shall be stored in a safe and secure manner.
(2) Fences around construction supplies or
debris shall be maintained.
(3)
Gates shall always be locked unless a worker is in attendance to prevent
unauthorized entry.
(4) During
exterior renovation work, overhead protection shall be provided for any
sidewalks or areas immediately beneath the work site or such areas shall be
fenced off and provided with warning signs to prevent entry.
(5) Workers shall be required to wear photo
identification badges at all times for identification and security purposes
while working at occupied sites.
(f) Separation of construction areas from
occupied spaces. Construction areas which are under the control of a contractor
and therefore not occupied by district staff or students shall be separated
from occupied areas. Provisions shall be made to prevent the passage of dust
and contaminants into occupied parts of the building. Periodic inspection and
repairs of the containment barriers must be made to prevent exposure to dust or
contaminants. Gypsum board must be used in exit ways or other areas that
require fire rated separation. Heavy duty plastic sheeting may be used only for
a vapor, fine dust or air infiltration barrier, and shall not be used to
separate occupied spaces from construction areas.
(1) A specific stairwell and/or elevator
should be assigned for construction worker use during work hours. In general,
workers may not use corridors, stairs or elevators designated for students or
school staff.
(2) Large amounts of
debris must be removed by using enclosed chutes or a similar sealed system.
There shall be no movement of debris through halls of occupied spaces of the
building. No material shall be dropped or thrown outside the walls of the
building.
(3) All occupied parts of
the building affected by renovation activity shall be cleaned at the close of
each workday. School buildings occupied during a construction project shall
maintain required health, safety and educational capabilities at all times that
classes are in session.
(g) Maintaining exiting and ventilation
during school construction projects. The following information shall be
included in all plans and specifications for school building projects:
(1) A plan detailing how exiting required by
the applicable building code will be maintained during construction. The plan
shall indicate temporary construction required to isolate construction
equipment, materials, people, dust, fumes, odors, and noise during the
construction period. Temporary construction details shall meet code-required
fire ratings for separation and corridor enclosure. At a minimum, required
exits, temporary stairs, ramps, exit signs, and door hardware shall be provided
at all times.
A plan detailing how adequate ventilation will be maintained during construction. The plan shall indicate ductwork which must be rerouted, disconnected, or capped in order to prevent contaminants from the construction area from entering the occupied areas of the building. The plan shall also indicate how required ventilation to occupied spaces affected by construction will be maintained during the project.
(h) Fire and hazard prevention.
Areas of buildings under construction that are to remain occupied shall
maintain a certificate of occupancy. In addition, the following shall be
strictly enforced:
(1) No smoking is allowed
on public school property, including construction areas.
(2) During construction daily inspections of
district occupied areas shall be conducted by school district personnel to
assure that construction materials, equipment or debris not block fire exits or
emergency egress windows.
(3)
Proper operation of fire extinguishers, fire alarm, and smoke/fire detection
systems shall be maintained throughout the project.
(i) Noise abatement during construction and
maintenance activities. Construction and maintenance operations shall not
produce noise in excess of 60 dba in occupied spaces or shall be scheduled for
times when the building or affected building spaces are not occupied or
acoustical abatement measures shall be taken. Noise level measurements (dba)
shall be taken with a type 2 sound level meter in the occupied space in a
location closest to the source of the noise. Complaints regarding excessive
noise shall be addressed through the health and safety committee. The district
should anticipate those times when construction noise is unacceptable and
incorporate "no work" periods into the bid specifications.
(j) Control of chemical fumes, gases, and
other contaminants during construction and maintenance projects. The bid
specifications and construction contracts for each construction project shall
indicate how and where welding, gasoline engine, roofing, paving, painting or
other fumes will be exhausted. Care must be taken to assure fresh air intakes
do not draw in such fumes.
(1) The bid
specifications shall require schedules of work on construction and maintenance
projects which include time for off-gassing of volatile organic compounds
introduced during construction before occupancy is allowed. Specific attention
is warranted for activities including glues, paint, furniture, carpeting, wall
coverings, and drapery. Manufacturers shall be contacted to obtain information
regarding appropriate temperatures and times needed to cure or ventilate the
product during use and before safe occupancy of a space can be assured.
Building materials or furnishings which off-gas chemical fumes, gases, or other
contaminants shall be aired out in a well ventilated heated warehouse before it
is brought to the project for installation or the manufacturer's recommended
off-gassing periods must be scheduled between installation and use of the
space. If the work will generate toxic gases that cannot be contained in an
isolated area, the work must be done when school classes and programs are not
in session. The building must be properly ventilated and the material must be
given proper time to cure or off-gas before re-occupancy.
(2) Manufacturer's material safety data
sheets (MSD) shall be maintained at the site for all products used in the
project. MSDS must be provided to anyone who requests them. MSDS indicate
chemicals used in the product, product toxicity, typical side effects of
exposure to the product and safe procedures for use of the product.
(k) Asbestos abatement protocols.
All asbestos abatement projects shall comply with all applicable Federal and
State laws including but not limited to the New York State Department of Labor
industrial code rule 56 (12 NYCRR 56), and the Federal Asbestos Hazard
Emergency Response Act (AHERA), 40 CFR part 763 (Code of Federal Regulations,
1998 Edition, Superintendent of Public Documents, U.S. Government Printing
Office, Washington, DC 20402; 1998; available at the Office of Facilities
Planning, Education Building Annex, Room 1060, State Education Department,
Albany, NY 12234). Large and small asbestos projects as defined by 12 NYCRR 56
shall not be performed while the building is occupied. Minor asbestos projects
defined by 12 NYCRR 56 as an asbestos project involving the removal,
disturbance, repair, encapsulation, enclosure or handling of 10 square feet or
less of asbestos or asbestos material, or 25 linear feet or less of asbestos or
asbestos material may be performed in unoccupied areas of an occupied building
in accordance with the above referenced regulations.
(l) Lead paint. Any construction or
maintenance operations which will disturb lead based paint will require
abatement of those areas pursuant to protocols detailed in the "Guidelines for
the Evaluation and Control of Lead-Based Paint Hazards in Housing" (June 1995;
U.S. Department of Housing and Urban Development, Washington, D.C. 20410;
available at the Office of Facilities Planning, Education Building Annex, Room
1060, State Education Department, Albany, NY 12234). All areas scheduled for
construction as well as areas of flaking and peeling paint shall be tested for
the presence of lead and abated or encapsulated in accordance with the above
noted guidelines.
(m) Radon.
Districts shall take responsibility to be aware of the geological potential for
high levels of radon and to test and mitigate as appropriate. This information
is available from the New York State Department of Health Radon Measurement
Database.
(n) Post construction
inspection. The school district or board of cooperative educational services
shall provide the opportunity for a walk-through inspection by the health and
safety committee members to confirm that the area is ready to be reopened for
use.