For the purposes of this rule, "owner
or operator" means the owner or operator of a scrap tire transportation
business, the owner or operator of a scrap tire storage facility, the owner or
operator of a scrap tire recovery facility, the owner or operator of a mobile
scrap tire recovery facility, the owner or operator of a scrap tire monocell,
or the owner or operator of a scrap tire monofill.
[Comment: Financial assurance
information is submitted as part of a permit to install or registration
certificate application for a new scrap tire facility, a modification that
increases the closure cost estimate of an existing scrap tire facility, a
modification that increases the post-closure care cost estimate of an existing
scrap tire facility, or an alteration to a scrap tire facility that changes the
amount of scrap tires or scrap tire product stored. For a scrap tire
transporter, financial assurance information is executed and funded as part of
an initial registration certificate application.]
(A)
Exclusions. The
owner or operator of the following scrap tire facilities are excluded from the
requirements of this rule:
(1)
A scrap tire collection facility.
(2)
A scrap tire
monocell facility operating in accordance with rule
3745-580-600 of the
Administrative Code.
(B)
Closure cost
estimate. The owner or operator shall prepare a closure cost estimate in
accordance with the following criteria:
(1)
For a scrap tire
storage facility or a scrap tire recovery facility, a written closure cost
estimate identifying the cost for a third party to conduct closure at the point
in the operating life of the facility when the extent and manner of operation
would make closure the most expensive. Ohio EPA may review, approve, or require
revisions to the closure cost estimate or to the closure financial assurance
instrument. Using the conversion factors contained in rule
3745-580-09 of the
Administrative Code, the owner or operator shall calculate the closure cost
estimate in current dollars and as follows:
(a)
For a class I or
class II scrap tire storage facility, a minimum of one dollar per passenger
tire equivalent for the maximum number of scrap tires authorized to be stored
at the facility.
(b)
For a class I or class II scrap tire recovery facility,
the sum of the following for the maximum number of scrap tires authorized to be
stored at the facility:
(i)
For whole scrap tires including baled tires and rough
tire shreds, a minimum of one dollar per passenger tire
equivalent.
(ii)
For processed scrap tires other than baled tires and
rough tire shreds that meet the definition of a scrap tire, the cost for
removal and transportation to a scrap tire monocell or monofill facility and
disposal of the maximum amount of processed tires to be stored at the scrap
tire recovery facility.
(iii)
For all other processed scrap tires including component
parts, partially assembled and fully assembled products made from scrap tires,
scrap tire by-products, and scrap tire residuals, the cost of removal and
transport from the scrap tire recovery facility to a recycling facility or the
cost of removal, transport, and disposal from the scrap tire recovery facility
to a solid waste disposal facility prior to closure of the scrap tire recovery
facility.
(2)
For a scrap tire
transporter, equal to the amount specified in section
3734.74 of the Revised
Code.
(3)
For a mobile scrap tire recovery facility or mobile
scrap tire recovery equipment operated by a licensed class I or class II scrap
tire recovery facility at a site other than the scrap tire recovery facility's
licensed site, equal to fifty thousand dollars.
(4)
For a scrap tire
monofill facility, an itemized written closure cost estimate in current dollars
identifying the cost for a third party to conduct closure at the point in the
operating life of the facility when the extent and manner of its operation
would make the closure the most expensive. Ohio EPA may review, approve, or
require revisions to the closure cost estimate or to the closure financial
assurance instrument.
(C)
Post-closure care
cost estimate for a scrap tire monofill facility. The owner or operator of a
scrap tire monofill facility shall prepare a written post-closure care cost
estimate in current dollars, identifying the cost for a third party to conduct
post-closure care.
(D)
Closure cost estimate review. The owner or operator of
a scrap tire facility shall review and make appropriate revisions to the
closure cost estimate as follows:
(1)
For a scrap tire monofill facility, annually adjust the
closure cost estimate by multiplying it by the preceding February inflation
factor derived from the annual implicit price deflator for gross domestic
product as published by the U.S. department of commerce.
(2)
For a scrap tire
storage facility and scrap tire recovery facility, annually.
(3)
As part of the
submittal for a permit to install or a registration application for a
modification to an existing scrap tire facility.
(4)
Upon concurrence
of an alteration to an existing scrap tire facility.
(5)
Whenever a change
at the facility increases the cost of closure. The review shall take into
consideration changes to the storage capacity.
(E)
Post-closure care
cost estimate review. The owner or operator of a scrap tire monofill facility
shall review and make appropriate revisions to the post-closure care cost
estimate as follows:
(1)
Annually to adjust the post-closure care cost estimate
by multiplying it by the preceding February inflation factor derived from the
annual implicit price deflator for gross domestic product as published by the
U.S. department of commerce.
(2)
As part of the
submittal for a permit to install for a modification to an existing scrap tire
monofill facility.
(3)
Whenever a change in the post-closure care activities
increases the cost of postclosure care.
(F)
Whenever a
revision performed as specified in paragraph (D) or (E) of this rule results in
an increase to the closure cost estimate or post-closure care cost estimate,
the owner or operator shall ensure the financial assurance instrument is
increased in accordance with rule
3745-503-05 or
3745-503-10 of the
Administrative Code, as applicable.
(G)
The owner or
operator of a scrap tire storage facility or scrap tire recovery facility may
request a reduction in the financial assurance if the owner or operator reduces
the size of the scrap tire storage areas.
(H)
The owner or
operator shall ensure financial assurance instruments account for increases in
the closure cost estimate and that sufficient financial assurance is available
for closure activities at all times during the operating life of the scrap tire
facility and until the facility is certified closed.
(I)
For a scrap tire
monofill facility, the owner or operator shall ensure financial assurance
instruments account for increases in the post-closure care cost estimate and
that sufficient financial assurance is available at all times during the
post-closure care period, until the post-closure care period
ends.
(J)
The director may require revisions to the closure cost
estimate, post-closure care cost estimate, or financial assurance instrument if
the director determines that the cost of closure or post-closure care exceeds
the cost estimate or the amount of the financial assurance
instrument.
(K)
Paragraph (B)(1) or (B)(4) of this rule is not
applicable to the owner or operator if the closure cost estimate is five
thousand five hundred dollars or less.