Or. Admin. R. 340-216-0052 - Construction ACDP
(1)
Purpose. A Construction ACDP is a permit for approval of Type 3 construction or
modification changes as specified in OAR 340-210-0225 and 340-210-0240. The
Construction ACDP includes requirements for the construction or modification of
stationary sources or air pollution control devices and does not by itself
provide authorization to operate the new construction or modification. A new or
modified Standard ACDP or Oregon Title V Operating Permit is required before
operation of the new construction or modification. A Construction ACDP may be
used for the following situations:
(a) For
complex construction or modification projects that require an extended period
of time to construct, the Construction ACDP may provide construction approval
faster than issuance of a Standard ACDP or modified Standard ACDP because the
operating requirements would not need to be included in the permit.
(b) For Oregon Title V Operating Permit
sources, the Construction ACDP may include the requirements of OAR 340-218-0050
and follow the external review procedures in OAR 340-218-0210 and 340-218-0230
so that the requirements may later be incorporated into the Oregon Title V
Operating Permit by an administrative amendment. If the applicant elects to
incorporate the Construction ACDP by administrative amendment, all of the
application submittal, permit content, and permit issuance requirements of OAR
340 division 218 must be met for the Construction ACDP.
(2) Application requirements. Any person
requesting a Construction ACDP must:
(a)
Submit an application according to OAR 340-216-0040 and provide the information
specified in 340-216-0040(1) as it relates to the proposed new construction or
modification; and
(b) Provide a
list of any applicable requirements related to the new construction or
modification.
(4) Permit content. A
Construction ACDP must include at least the following:
(a) A requirement that construction must
commence within 18 months after the permit is issued if required by OAR
340-224-0030(4);
(b) A requirement
to construct according to approved plans;
(c) A requirement to comply with all
applicable requirements;
(d)
Emission limits for affected stationary sources;
(e) Performance standards for affected
stationary sources and air pollution control devices;
(f) Performance test requirements;
(g) Monitoring requirements, if specialized
equipment is required (e.g., continuous monitoring systems);
(h) Notification and reporting requirements
(construction status reports, startup dates, source test plans, CEMS
performance specification testing plans, etc.);
(i) General ACDP conditions for incorporating
generally applicable requirements;
(j) A requirement to modify the operating
permit before commencing operation of the new construction or
modification;
(k) A permit
expiration date of no more than 5 years; and
(l) Oregon Title V Permit requirements as
specified in OAR 340-218-0050, if the applicant requests the external review
procedures in 340-218-0210 and 340-218-0230.
(5) Permit issuance procedures:
(a) A Construction ACDP requires that DEQ
provide public notice according to OAR 340 division 209 as a Category III
permit action.
(b) For sources
subject to the Oregon Title V Operating Permit program, the applicant may ask
for the external review procedures in OAR 340-218-0210 and 340-218-0230 in
addition to the requirements of OAR 340 division 209 to allow the Construction
ACDP to be incorporated into the Oregon Title V Operating Permit at a later
date by an administrative amendment provided the requirements of subsection
(1)(b) are met.
(c) Issuance of a
modified Construction ACDP requires the following public notice, as applicable:
(A) Public notice as a Category I permit
action under OAR 340 division 209 for non-technical modifications and basic and
simple technical modifications; or
(B) Public notice as a Category II permit
action under OAR 340 division 209 for moderate and complex technical
modifications.
(6) Construction ACDPs may not be renewed.
[
[
Notes
Tables referenced are available from the
Statutory/Other Authority: ORS 468.020, 468.065, 468A.025, 468A.040, 468A.310 & 468A.315
Statutes/Other Implemented: ORS 468 & 468A