Or. Admin. R. 629-623-0550 - Road Construction - Intermediate Public Safety Risk
(1) When
constructing roads on high landslide hazard locations or other very steep
slopes with intermediate downslope public safety risk, operators shall follow
site-specific practices as directed by a geotechnical specialist.
(2) In addition to the road construction and
maintenance rules in OAR
629-625-0100
through
629-625-0440,
written plans shall include:
(a) An
evaluation of cutslope stability that demonstrates major cutslope failure is
very unlikely; and
(b) A
description of measures to be taken to prevent water from draining onto high
landslide hazard locations.
Notes
Stat. Auth.: ORS 527.710(10)
Stats. Implemented: ORS 527.630(5), 527.674 & 527.714
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.